Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Availability (assume Team Availability Calendar is up to date, otherwise, everyone was available for 8.5 days of the 2-week Sprint)

Full team availability 8.5-day Sprint * 9 dev team members (adjusted as below)???



Total team availability this Sprint????



POs present a review of Sprint goals and other committed work



Sprint Goal

  1. Set up Trainee UI infrastructure and integrate CurriculumGMCreference into TIS and NDW.
  2. Create an AWS SFTP server and set up auditing for records and messages.
  3. Continued improvement with Placement Planner.



POs supported by Dev team provide a narrative on why, and what, emergency work was brought into the Sprint and which committed-to tickets were moved out as a result


Live Issues:

Jira Legacy
serverSystem JIRA
columnstype,summary,story points (effort),assignee,created,status
maximumIssues20
jqlQueryproject = TISNEW AND issuetype in (LiveDefect, Support) AND Sprint = 259 order by created DESC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7


Dev team demo 'done' work contributing to those goals (no more reference to specific list of Jira tickets, and no more reference to work not 'done')



AreaItemDemo - from Prod URL where feasible

Continued improvement with Placement Planner

  1. Maximise planner space i.e. each placement of a given post to be on the same line unless they are in a shared slot.
  2. For ‘small length’ placements just display placement type (circle). The other placement details are displayed via a tooltip.
  3. Fix a bug whereby choosing a PPT 'Date From' e.g. 31/10 (where the next month has less days than the first month - in this case Nov has 30 days) will result in incorrect timeline months being displayed).




AWS CognitoUser authentication service for Trainee UI
View file
nameuntitled.mp4
height250


















Stakeholders / Users invited to query / interrogate / applaud (after Sprint Review POs convert consensus inputs into backlog tickets, giving the option to consider them in the coming Sprint Planning)



Sprint Goal (achieved? (thumbs up) / (thumbs down)): 

  1. Set up Trainee UI infrastructure and integrate CurriculumGMCreference into TIS and NDW.
  2. Create an AWS SFTP server and set up auditing for records and messages.
  3. Continued improvement with Placement Planner.



Next Sprint priorities