What is the purpose of planning?

...

What is the purpose of planning?

Info
  1. Identify goal(s) and what needs to be done and ID specific stories against the goal(s)

  2. Planning tickets to bring into Ready for Dev to work on (most of which to complete) in next iteration.

  3. Ditto above, plus check the capacity of the team in the next two weeks (availability etc)

  4. Resolve prioritisation / sequencing

  5. Assessing work in progress on the board against refreshed goals

  6. Planning is not a refinement session - this is what the Refinement session

TA-JiraDash: Issue summary report - JIRA (atlassian.net)

...

Panel
panelIconIdatlassian-info
panelIcon:info:
bgColor#FFEBE6

FOCUS

  • Post Funding - no development - need to take stock and plan implementation

  • Keycloak to Cognito - primary focus towards implementation on 11 Dec (target) and post wash-up

  • Revalidation research - should run a an ideation session this iteration (carried over from last)

  • Address curriculum bulk upload - raised at review and after inquiry this is the time to do it in the prep new trainees et al.

Team availability (e.g., Leave & Events)

  • James off this weekTobi - 22nd - 10th Dec.

  • WT&E Awayday 10 Dec

  • _________________________________________________________________________

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161
****

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887
BLOCKED
Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486
BLOCKED

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6616

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6687
BLOCKED

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6750

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6740

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6739

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6749

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6747

Possible plan - taken from Slack 15 Nov

  1. Switchover plan:

  • Set up a meeting in early next week (the week commencing Nov 18)

  • Target: have a step by step switchover plan alongside the rollback plan

  1. Comms - discuss with Rob

  • Can we draft and send comms next week (the week commencing Nov 18) ?

  • Only send comms about Prod changes

  • Users will have to use a valid email after switchover

We will also need to notify users on the upcoming changes on Stage (maybe banner on the app)3. Stage switchover

  • Target date: Nov 26

  • We expect to switchover on 26th and then let the key users finish the tests on the same day, and then verify rollback plan.

  • Identify key users to do extended testing.

  • Failure: if deployment fails, and we cannot get Stage fully ready for testing until afternoon, we have to agree to roll back, and then notify users. This will result in a 2nd deployment on Stage on Dec 9

  • Tobi will be on leave, and we need to seek help from Godstime

  1. Prod switchover:

  • Target date: Dec 11

Data general

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1135

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6642

Data bulk upload

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1137

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3819

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3822

6

Revalidation performance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6275
flagged!

8

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328
flagged

Jenkins –

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6448

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2702

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6674

9

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6436
BLOCKED

10

Retro

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6684

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6760

12

TSS dependencies

13

Roadmap review

________________________________________________

Panel
panelIconIdatlassian-info
panelIcon:info:
bgColor#FFEBE6

FOCUS

  • Post Funding - no development - need to take stock and plan implementation

  • Keycloak to Cognito - primary focus towards implementation

  • Revalidation research - should run a ideation session this iteration

  • Address curriculum bulk upload - raised at review and after inquiry this is the time to do it in the prep new trainees et al.

Team availability (e.g., Leave & Events)

  • James off this week

  • Tobi - 22nd - 10th Dec.

  • __________________________________________________________________________

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161
****

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887
BLOCKED
Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486
BLOCKED

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6616

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6687

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6457

Possible plan - taken from Slack 15 Nov

  1. Switchover plan:

  • Set up a meeting in early next week (the week commencing Nov 18)

  • Target: have a step by step switchover plan alongside the rollback plan

  1. Comms - discuss with Rob

  • Can we draft and send comms next week (the week commencing Nov 18) ?

  • Only send comms about Prod changes

  • Users will have to use a valid email after switchover

We will also need to notify users on the upcoming changes on Stage (maybe banner on the app)3. Stage switchover

  • Target date: Nov 26

  • We expect to switchover on 26th and then let the key users finish the tests on the same day, and then verify rollback plan.

  • Identify key users to do extended testing.

  • Failure: if deployment fails, and we cannot get Stage fully ready for testing until afternoon, we have to agree to roll back, and then notify users. This will result in a 2nd deployment on Stage on Dec 9

  • Tobi will be on leave, and we need to seek help from Godstime

  1. Prod switchover:

  • Target date: Dec 11

Data general

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1135

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6642

Data bulk upload

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1137

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3819

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3822

6

Revalidation performance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6275
flagged!

8

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328
flagged

Jenkins –

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6448

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2702

9

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6436
BLOCKED

10

Retro

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6684

12

TSS dependencies

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6441

13

Roadmap review

________________________________________________

...

Panel
panelIconIdatlassian-info
panelIcon:info:
bgColor#FFEBE6

FOCUS

  • Post Funding - address how to deliver 161

  • Keycloak to Cognito - continuity

  • Revalidation research - digest feedback

Team availability (e.g., Leave & Events)

  • Yafang - off two weeks (back 4th Nov)

  • Tobi off 25 Oct

  • Pepe at conference 24/25 Oct

  • James off Nov 1 to 18 Nov

  • Rob may take a day off

  • __________________________________________________________________________

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4804

then next…

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161
****

Re-write / review 2687

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887
BLOCKED
Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6453

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486
BLOCKED

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6616

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6457
(early socialisation and input)

Quote from Slack ----- The epic doesn't allow me to order, but my thinking for the following work is:

  1. Revalidation UI & token (2486 imp, 6081 done)

  2. Revalidation API-Gateway (6456 NR)

  3. UserManagement functionality tickets (6435 imp, BL 6491 unrefined, 2704 NR), then switchover ticket (6454 BL unrefined, 6455 BL refined)

  4. User manual (6457 Ready)

  5. lambda with private connection (6453 imp)

Data general

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1135

4

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6458
small ticket to tidy up

6

Revalidation performance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6275
flagged!

8

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328

Tidy up LO changes -

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6458
end of Oct changes for local teams.

9

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6436

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6610

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6637

10

Retro https://hee-tis.atlassian.net/wiki/x/DQC2-g

12

TSS dependencies

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6441

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6625

13

Roadmap review

________________________________________________

...

Panel
panelIconIdatlassian-info
panelIcon:info:
bgColor#EAE6FF

FOCUS

  • Post Funding - continuity

  • Keycloak to Cognito - continuity

  • Revalidation research - digest

Team availability (e.g., Leave & Events)

  • Cai 18-21 (Fri Mon) annual leave

  • Yafang 21st for two weeks annual leave

__________________________________________________________________________

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4804

then next…

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161
****

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5813

Re-write / review 2687

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6453

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486

then next…

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6435

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6457
(early socialisation and input)

Quote from Slack ----- The epic doesn't allow me to order, but my thinking for the following work is:

  1. Revalidation UI & token (2486 imp, 6081 done)

  2. Revalidation API-Gateway (6456 NR)

  3. UserManagement functionality tickets (6435 imp, BL 6491 unrefined, 2704 NR), then switchover ticket (6454 BL unrefined, 6455 BL refined)

  4. User manual (6457 Ready)

  5. lambda with private connection (6453 imp)

3

Jenkins security vulnerabilities

Data general

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1135

4

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6458
small ticket to tidy up

6

Revalidation performance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6275

8

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328

Tidy up LO changes -

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6458
end of Oct changes for local teams.

9

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6436

10

Retro https://hee-tis.atlassian.net/wiki/x/DQC2-g

12

TSS dependencies

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6441

13

Roadmap review

________________________________________________

...

Panel
panelIconIdatlassian-info
panelIcon:info:
bgColor#FFEBE6

FOCUS

  • Post Funding - continuity

  • Keycloak to Cognito - continuity

  • Revalidation research feedback - continuity

Team availability (e.g., Leave & Events)

__________________________________________________________________________

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4804

then next…

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5813

Re-write / review 2687

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

then next… 6081 and 6453 bring in

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6457
(early socialisation and input)

Quoye from Slack ----- The epic doesn't allow me to order, but my thinking for the following work is:

  1. Revalidation UI & token (2486, 6081)

  2. Revalidation API-Gateway (6456)

  3. UserManagement functionality tickets (6435, 6491, 2704), then switchover ticket (6454, 6455)

  4. User manual (6457)

  5. lambda with private connection (6453)

3

Jenkins security vulnerabilities

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6448

Data general

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1135

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6496

4

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

6

Revalidation research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4634

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6288
ongoing through iteration

8

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328

Reval performance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

Tidy up LO changes -

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6458
end of Oct changes for local teams.

Reval improve user experience

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6275

9

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6436

10

Retro https://hee-tis.atlassian.net/wiki/x/DQC2-g

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6571

12

TSS dependencies

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6292

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6441

13

Roadmap review

TIS Admin product roadmap.pptx

...

Panel
panelIconIdatlassian-info
panelIcon:info:
bgColor#B3F5FF

FOCUS

  • Post Funding - continuity

  • Keycloak to Cognito - continuity

  • Revalidation research feedback

  • NIMDTA bug

Team availability (e.g., Leave & Events)

  • Jay off until Mon 23 Sept

...

__________________________________________________________________________

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4804

then next…

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5813

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

then next…

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6452

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6457
(early socialisation and input)

3

Jenkins security vulnerabilities

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6448

4

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

6294 6293 6284 6283 + 6458 in refinement (6294 prob first)

5

ESR

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6213

Still investigating ESR to TIS data transfer. May need to look at things as they come in.

6

Revalidation research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4634

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6288
ongoing through iteration

8

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328

Reval performance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

9

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6451

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6436

10

Retro

Cai reform of retro - https://hee-tis.atlassian.net/wiki/x/DQC2-g

11

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2921

12

13

Roadmap review

TIS Admin product roadmap.pptx

...

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5813

Need to refine 161 urgently - are we in a position to do so?

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

then what next?

3

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6260

Look at search James may look at 6294 6293 6284 6283

4

ESR

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6213

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6324

5

Revalidation research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4634

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6288
ongoing through iteration

6

Review epic

7

Other work to note

Search

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6328

User management research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6213

Reval peformance

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4961

8

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6359

9

Retro

6374

11

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2921

Nothing this iteration

12

13

Roadmap review

TIS Admin product roadmap.pptx

...

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5813

Need to refine 161 urgently

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6309
then

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

3

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6282
James may look at 6294 6293 6284 6283

4

5

Revalidation research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4634

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6288
ongoing through iteration

6

User management research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6107

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6111

7

8

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6316
****Blocked****

9

Retro

Nothing this iteration

11

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2921

Nothing this iteration

12

13

Roadmap review

TIS Admin product roadmap.pptx

...

Work lined up for the iteration

1

Post funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5892
should be resolved iteration

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5813

Need to confirm follow-on ticket(s) currently in refinement.

2

Keycloak-Cognito

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-1931

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6310
underway

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6309
then

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

3

Local office and DB

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6331

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6266
OK will be done

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6261
next one

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6282
James may look at

4

5

Revalidation research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4634

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6288
ongoing through iteration

6

User management research

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6107

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6111
?

7

8

Bugs and live issues

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6316
may not be completed in iteration

9

Retro

Nothing this iteration

10

ESR Support

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6147

11

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2921

Nothing this iteration

12

13

Roadmap review

TIS Admin product roadmap.pptx

...

Work lined up for the iteration

 1

ESR Support

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6147
ongoing

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6214

NINO in NE - what work should be done in this area?

Post Funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5892

3

Cognito Migration

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5887

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6223
.

Deployment plan informs order of work. Poss some tickets to be ID’ed, refined and poss brought in. 5887

Research - user management

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6111
not brought in

 5

 

Local office name change

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6266

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6261

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6282
> comms bring in via refinement

Bonus

Bulk update ----

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3819

3

Cross team

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5805
---

4

Tech - improvement

 From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4335

6

ESR

17

Data

From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

11

Retro actions

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6138

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6281

12

Roadmap review

TIS Admin product roadmap.pptx

...

Work lined up for the iteration

 1

ESR Support

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6147
ongoing

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6214

NINO in NE

Post Funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5812
nearly closed

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5892

Others in refinement can be brought in

3

Cognito Migration

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6223
.

6223

Research - user management

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6110
(ongoing) Sarah

 5

 

Local office name change

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6228

Bonus

Bulk update ----

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3819

3

Cross team

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5805
---

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4648
- Naz review

4

Tech - improvement

 From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752
n - await

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3162
brought into iteration by Andy Dingley with Devops input.

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4335
--nongoing

6

ESR

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5806
- Tobi looking at ops related Confident being done in iteration. Related to live defect.

17

Data

From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

11

Retro actions

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6138

12

Roadmap review

TIS Admin product roadmap.pptx

...

Work lined up for the iteration

0

Live Defect

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6217
Cai to arrange call if need be to support with documentation.

 

Support

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6147

 1

Post Funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5812
Ongoing peer review/code review

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-161

 

2

Cognito Migration

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6080
yafang to create a ticket for deployment plan as currently we can’t deploy as for when ready. So to reduce interruption we need a deployment plan.

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486
for AdHoc refinement this afternoon.

3

Revalidation: UR

Touch base with Ade B

4

Other Tech improvement

 From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3162
brought into iteration by Andy Dingley with Devops input

6

ESR

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5806
ongoing would require Devops input

17

Data work

From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

 

11

Retro actions

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6138

 

 

BAs and UR work

 

 

 

 

LTFT Alpha

 UR: Ade B -joint work with trainee team.

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4648
Ongoing

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6109
Ongoing

 

Ade Babalola: LTFT Discovery Plan.xls

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

 

...

Work lined up for the iteration

0

Live Defect

 

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6043
Cai need to close up a support call then move to done.

 

Support

 

 1

Post Funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5812
Aim to complete in this iteration but aware this may be compromised by the ESR work going on

 

2

Cognito Migration

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486
for AdHoc refinement this afternoon.

5887 was collectively agreed to

3

Revalidation: UR

Touch base with Ade B

4

Other Tech improvement

 From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3162
brought into iteration by Andy Dingley. This is a cross team work.

 

 

 

4

Programme Membership

In flight

 

5

TIS assessment

 

6

ESR

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6147

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5806
ongoing

17

Data work

From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

 

11

Retro actions

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6069
team to visit page and leave comments then ready to be moved to ‘done’

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6070

 

BAs and UR work

 

LTFT Alpha

 UR: Ade B -joint work with trainee team.

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4648
Catherine to touch base with Ade B.

UR revalidation:

Sarah: User management research -

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6108

 

Ade Babalola: LTFT Discovery Plan.xls

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

 

...

Work lined up for the iteration

0

Live Defect

 

 

Support

 1

Post Funding

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-3273

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5812
Collaborative work between Jay and Yafang but we are mindful that Yafang will be away for the rest of the iteration. Therefore team to step in and support when necessary.

 

2

Cognito Migration

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-2486
for AdHoc refinement this afternoon.

5887 was collectively agreed to

3

Revalidation: UR

Touch base with Ade B

4

Other Tech improvement

 From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

4

Programme Membership

In flight

 

5

TIS assessment

 

6

ESR

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5806
ongoing

17

Data work

From last iteration and continue into new iteration:

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5752

11

Retro actions

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6069

 

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6070

 

BAs and UR work

LTFT Alpha

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-5438

Cross-team effort, involving Ade B and Ade A .: Naz to guide through the approach we’re taking with Alpha: ? define MVP for both Trainee and Admin

Sarah: User management research to be ticket up for visibility

Ade Babalola: LTFT Discovery Plan.xls

 

 

12

Roadmap review