Production Application releases / updates
| | TIS-52 |
|
|
BAU. To include: - PO Group to refine priorities in the backlog - Alistair Pringle (Unlicensed), Joanne Watson (Unlicensed), Former user (Deleted), Ashley Ransoo
This is the #1 priority piece of work for the POs during the Sprint. - Jayanta and Hamed, supported by John will form a BAU team this Sprint to focus on Bugs.
- TISDEV-5030: Multiple FundingType per Posts are duplicating Posts in the post list -TO DO - TISDEV-5003: Placements created have 'disappeared' - DONE - TISDEV-4879: Placements is allowing users to select Inactive posts Recording Placements - IN PROGRESS - TISDEV-4961: TIS has reverted changes made by users (Ophthalmology) - DONE - TISDEV-4855: Cannot update site of Post when post is linked to a rotation Record Creation (Post) - READY FOR RELEASE - TISDEV-4631: TIS_NDW ETL error handling is looping and filling logs - DONE - TISDEV-4679: Changes to rotation are not reflected in ProgrammeMembership Record Programme Memberships - NOT REQUIRED - TISDEV-4351: Training Descriptions not displayed in Placements Recording Placements - NOT REQUIRED - TISDEV-5051: Duplicate Main Site / Approved Grade / Primary Specialty created when editing a post with auto-generate NPN set - READY FOR RELEASE. You may not have all the skills and knowledge to handle all the priority Bugs, but this is a great way of:- getting exposure to the widest degree of the codebase / infrastructure
- pair with other members of the team who have the knowledge / skills needed
- instigate knowledge transfer sessions when encountering an area of the codebase / infrastructure with which there is unfamiliarity
- encouraging liaison with the PO Group in order to confirm business value for each Bug and the extent (speed of turnaround, breadth of solution required, longevity for the solution, etc) needed
| Jayanta Saha Former user (Deleted) John Simmons (Deactivated) Oladimeji Onalaja (Unlicensed)
| Status of work: Total 9 tickets were allocated to the BAU team. 5 of them are successfully done by Jayanta Saha, Oladimeji Onalaja (Unlicensed), Chris Mills (Unlicensed) Luís Matos (Unlicensed) and Sunil Rochani (Unlicensed). Help and advice were taken from Paul Hoang (Unlicensed) and John Simmons (Deactivated). Hamed' s ticket is in progress and ticket 5030 is in 'to do' status. Rest of the 2 tickets are marked 'Not required' during sprint planning meeting. Some other tickets which are not in this area but also were done or work in progress is TISDEV-5179, TISDEV - 4794, TISDEV-5068, TISDEV-4864 and TISDEV - 5125.
|
| TISDEV-4855 https://www.useloom.com/share/ae1fd4c2301c4ace99e8d40dfb2c407c
TISDEV-4854 https://www.useloom.com/share/ae3240672b1c49a1b8c1ada1028c47ac TISDEV-4452 https://www.useloom.com/share/045675ecba234464856d9f87bf1964cb |
Technical debt + - Each functional group - FED, BED, Ops, Everyone else (I do not want to discount others in the team), to determine their top 'n' number of high priority tech debt, size it, allocate it, and timebox days in the Sprint to address it.
| All team | Testing (Simon)
Gap analysis for TCS unit test coverage. Story + tasks created for starting to increase coverage in the next sprint Pact tests POC. Starting to look at TCS and its interactions with other services Testing (Shivani) - Fixed Programme e2e tests in regression test pack.
- Fixed Post e2e tests in regression test pack.
- Supported release testing by testing the release stories in staging and raised the defects.
- Worked on Contract testing strategy for TCS with Simon.Contract Testing Strategy for TCS
- KT Session with Luis for Document Management different flows. (Upload, Edit, Search)
- A session with Jag and Simon for ESR-ETL Pact testing implmented by Jag.
Panos: Increased FE unit test coverage (Programme Memberships) Prometheus/Grafana End points added for Prometheus in the following services: Revalidation, Concerns, Connection-Discrepancies Profile, TCS, Reference, Assessments, Generic Upload |
Grafana live demo (in Dev) https://dev-monitoring.tis.nhs.uk/ |
|
Knowledge transfer - Confluence housekeeping - especially deleting documentation that is out of date. Ongoing
- Dev standards (Dev meeting / series of meetings). Ongoing
- Pairing / Mobbing
- Git-commit messages
- Walk-throughs (prep as you go - links?).
- Architectural level diagrams (Reuben leading - update?)
| | Ola and John G - Knowledge transfer sessions on RxJs (Reactive programming) which is heavily used in the development of generic upload, document manger and new listing module.
- Walk-through on document manager and new Listings
- BE walk through on Document Management and ESR Pact testing
|
6. Application architecture | Document Manager (First pass) https://www.useloom.com/share/e35583768650428dabe33478985f34e5 |
Development (P1s - POs to review what are P1s in Jira as a matter of urgency) - Document management - accessing existing documents (better dataset to work from, but work needed to be done on reviewing metadata before dev work should commence), and creating, updates and deletes of new ones (easier to achieve). Chris / Luis
- Assessments Bulk Upload - Update please?
- Placement comments - Update please?
- Removal of deleted records - records marked as "Delete" in DR2, but brought over to TIS as "Current"
- NDW UAT missing data analysis - Fields that don't exist in TIS that NDW want in TIS. And fields that don't exist in NDW but do exist in TIS.
- ESR - Assisting ESR / NDW with live ESR issue - update please?
- DR planning - incl. geo-replication, roll back and build again scenarios (John S and Ops) - update please?
| | Placement comments (Panos) Comments related work has been completed. We have also added all required tests, but we ll have to improve the e2e test in terms of structure (test does work but it is not merged as per above requirement). 6. ESR: Jag: - High Priority middle names issue causing duplicates has been fixed (TISDEV-5081) and released (Release: TIS-52.2). (Jag)
- The above uncovered a break in contract between TCS and ESR-ETL because of rotation data being sent (Unplanned task). This was fixed (TISDEV-5187) and released (Release: TIS-52.3)
- ESR interface was switched back on. (TISDEV-5092)
- Full Notification files for all the local offices have been sent barring WMD which is planned during next week. (TISDEV-5062)
- Errored applicant records re-processing is in progress (TISDEV-4784)
Fred/Jag: - Fixed and enabled jenkins ftp syn cron job in prod getting rid off crontab.
Ashley/Jag: - Some BAU queries were looked into.
|
|
|
Resource Planning | |
|
|
|