Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This diagram outlines the data flows as we understand them between TIS, the National Data Warehouse (NDW) and Intrepid. The diagram shows Phase 1, (rebase enabled) which exists existed up until all Local Offices have had implemented onto TIS , and Phase 2 begins which began when we disable disabled the TIS inbound ETL and enable enabled the outbound to Intrepid.

Note Phase 2 evolved through iterative design, specifically to simplify the Intrepid-NDW flows.


Phase 2 is likely to be needed until all the Intrepid Modules are retired/replaced by TIS or other 3rd party solutions - currently projected to be by March 2019.


TIS - Intrepid Data Flows V1.0.pptx2.pptx


Image Added



NDW detailed design

A more detailed design of the Intrepid-NDW ETL and how the TIS-NDW ETL is consumed by the NDW can be found in this design and diagram from John Thompson - this is a static copy from  - please refer to John Thompson for updates.


DR2 Tables to NDW - part 1 spec.xlsx

Image Added