Summary

The absence of notifications was clocked and on investigation it was found that none had been sent from 10 August

Impact

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-6411
Trusts did not receive notifications as early as they usually would. All notifications from this period were sent on the 20th Aug.

Table of Contents

Non-technical Description

Notifications are usually sent to ESR every day, describing changes and updates to the “now & next” people in positions. The service did not generate the files for 11th - ?? .

Trigger

19th Aug because it was unable to complete the necessary queries and updates to the database within the allocated transaction time. Throughout this time, Applicant records were sent and confirmations received as normal.

Any notifications which should have gone out during this time and were still valid on the 20th were sent. For example the “now &next”(TM Pepe) notifications for job changeovers between 11th and 19th were sent on the 20th.

...

Trigger

We are confident without reproducing this that the quantity of notifications amongst other operational use triggered the combination of factors leading to this unplanned delay.

...

Detection

We noticed a lack of “Confirmation” messages files from ESR.

...

Resolution

Upsized the resources to enable to exporting jobs to run.

...

Timeline

  • Shovel setup but was persistent rather than temporary.

  • notifications not exported since 14:10 Last successful notification file generation.

  • 14:00 Repeated failures prevent .

  • issue noticed We noticed the delay to notification confirmations beyond ‘normal’ delays

  • 11:30 resized cluster, and it took 12mins

  • 11:50 deleted the shovel which was moving every error to esr.dlq.all.shovel.31072024.sending errors to a temporary queue

  • 12:10 and around indication on Metabase that the files for notifications have been created.

  • 15:27 - Received confirmation files

5 Whys (or other analysis of Root Cause)

We didn’t receive DCC conformation files because we didn’t send any files for ESR to confirm receipt of.

The attempts to build notifcation files failed (errors were logged as warnings but not reported via Sentry)

...

Database transactions timed out.

The database didn’t have the resources to complete the transaction within the time limit.

...

Action Items

Action Items

Owner

Comments

Maintain increased (maximum) tier.

Offset additional cost by scheduling cluster availability and size

Joseph (Pepe) Kelly

Jira Legacy
serverSystem Jira
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTIS21-4934

Change data retention to improve performance Not right now. Probably in the future.

See also:

...

Lessons

...