What is the purpose of planning?
Identify goal(s) and what needs to be done and ID specific stories against the goal(s)
Planning tickets to bring into Ready for Dev to work on (most of which to complete) in next iteration.
Ditto above, plus check the capacity of the team in the next two weeks (availability etc)
Resolve prioritisation / sequencing
Assessing work in progress on the board against refreshed goals
Planning is not a refinement session - this is what the Refinement session 2 days before is about
Nov 8, 2023
Goal(s) for the next Iteration:
Statement:
Focusing on
Team - Revalidation connections
Team availability (e.g., Leave & Events):
Full capacity
Non-Kanban work (this iteration):
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect |
|
| Support | Carried over… Review sync issues in Revalidation - next step = High Level Estimation Waiting
|
1 | Revalidation - Connections | From last iteration: Private Beta in flight https://hee-tis.atlassian.net/browse/TIS21-5152 Private Beta waiting
|
2 | Other Tech improvement |
|
3 | Post funding | Waiting
To be refined
Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = https://hee-tis.atlassian.net/browse/TIS21-3273 - we queried the scope around delivery plan. Further conversation to fletch some things. Based on discussion around what our actual focus is. |
4 | Programme Membership | In flight
|
5 | TIS assessment |
|
6 | ESR |
|
17 | Data work | From last iteration:
|
11 | Retro actions |
|
| LTFT discovery | Cross-team effort, involving Ade B and Ade A . https://hee-tis.atlassian.net/browse/TIS21-5118 Discuss moving time for Y&H as it clashes with the Admin Review Ade Babalola: LTFT Discovery Plan.xlsx
|
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Oct 25, 2023
Goal(s) for the next Iteration:
Statement:
Focusing on
Team - Revalidation connections
Team availability (e.g., Leave & Events):
Stan A/L 25th- 31st Oct
Jay 2nd-8th of November
Non-Kanban work (this iteration):
Rob to run a session on Roadmap
Preparation to meet with Revalidation leads.
Quarterly planning-
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | From last iteration: https://hee-tis.atlassian.net/browse/TIS21-5261 : Cai to arrange huddle this afternoon or tomo
|
| Support | Carried over… Review sync issues in Revalidation - next step = High Level Estimation Waiting
|
1 | Revalidation - Connections | From last iteration: Private Beta in flight https://hee-tis.atlassian.net/browse/TIS21-5152 Private Beta waiting
|
2 | Other Tech improvement |
|
3 | Post funding | Waiting
To be refined
Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = https://hee-tis.atlassian.net/browse/TIS21-3273 - we queried the scope around delivery plan. Further conversation to fletch some things. Based on discussion around what our actual focus is. |
4 | Programme Membership | In flight
|
5 | TIS assessment |
|
6 | ESR | https://hee-tis.atlassian.net/browse/TIS21-4985 If there is capacity/willingness to refine: https://hee-tis.atlassian.net/browse/TIS21-4985 |
17 | Data work | From last iteration: https://hee-tis.atlassian.net/browse/TIS21-4620 Further team discussion when Stan returns from A/L |
11 | Retro actions |
|
| LTFT discovery | Cross-team effort, involving Ade B and Ade A . https://hee-tis.atlassian.net/browse/TIS21-5118 Discuss moving time for Y&H as it clashes with the Admin Review Ade Babalola: LTFT Discovery Plan.xlsx
|
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Sep 13, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Pepe (A/L) 13th-15th Sept
Yafang (A/L) 15th-22nd of Sept
Cai (A/L) 18th-22nd of Sept
Non-Kanban work (this iteration):
Arrange a call with Revalidation leads ( Connections) to ascertain MVP IF WE FEEL that the F1 ticket and sync work will be advanced in this Iteration.
TBD: https://hee-tis.atlassian.net/browse/TIS21-4876 HLE session held.
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | From last iteration: Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24 https://hee-tis.atlassian.net/browse/TIS21-4689 Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? https://hee-tis.atlassian.net/browse/TIS21-4864 -(AdHoc) |
1 | Connections MVP dependent | In for development Review sync issues in Revalidation https://hee-tis.atlassian.net/browse/TIS21-4956 High priority as part of the MVP- with time box for 2 days. To further liaise with Pepe when back. |
2 | Revalidation - Connections | Private Beta in flight https://hee-tis.atlassian.net/browse/TIS21-4154 Dev plan to finish this ticket in the next one /two days ready to be presented at Review. https://hee-tis.atlassian.net/browse/TIS21-4690 Private Beta feedback Need to extend the access to the Private Beta, so looking to Ade B to continue a dialogue and to understand likely posy MVP developments and issues. |
3 | Revalidation designated body merger | I (Rob) needs to develop a ticket for this work. Tow London designated bodies are to become one. Depending on the size of this work (refinement) will determine when it is to be done, so starting this off will be something ASAP. |
4 | Other Tech improvement | In flight - does this involve us? In for development - does these involve us? Is it a Pepe one? |
5 | Changes to email | Specifically I would like to understand how to update all staff emails to NHS.NET (1) on Keycloak and (2) the Reval users who are different? It would be very helpful to get this understood so we can make sure resources are in place to support the change. We now have a spreadsheet from IT with “old” and “new” so we can map the chnges. |
6 | Post funding | https://hee-tis.atlassian.net/browse/TIS21-95 Next https://hee-tis.atlassian.net/browse/TIS21-4875 Would like to progress refining these tickets as they will be the next in line post MVP. |
7 | Programme Membership | In flight https://hee-tis.atlassian.net/browse/TIS21-3785 |
8 | BUGS | https://hee-tis.atlassian.net/browse/TIS21-4958 Potential ticket to come in to the iteration- impact audit of GMC end of October/November so would be important to get this work submitted. |
9 | ESR | In flight Lining up --- https://hee-tis.atlassian.net/browse/TIS21-4985 |
10 | Data work | In flight https://hee-tis.atlassian.net/browse/TIS21-4838 https://hee-tis.atlassian.net/browse/TIS21-5019 https://hee-tis.atlassian.net/browse/TIS21-4620 -AdHoc Huddle
|
11 | Retro actions | |
12 | LTFT discovery |
|
13 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Aug 30, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Pepe (A/L) 31st of Aug- 15th of September
Yafang (A/L) 1st September
Non-Kanban work (this iteration):
Arrange a call with Revalidation leads ( Connections) to ascertain MVP
TBD: https://hee-tis.atlassian.net/browse/TIS21-4876 HLE session held. Rob has an upcoming call with Stephen Loughran to get an email list if possible. (outcome to help support with GMC’s email query)
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | From last iteration: Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24 https://hee-tis.atlassian.net/browse/TIS21-4689 Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? https://hee-tis.atlassian.net/browse/TIS21-4864 -(AdHoc) |
| Support | Carried over… Review sync issues in Revalidation - next step = High Level Estimation https://hee-tis.atlassian.net/browse/TIS21-4956 Waiting
|
1 | Revalidation - Connections | From last iteration: Private Beta in flight https://hee-tis.atlassian.net/browse/TIS21-4154 Private Beta waiting https://hee-tis.atlassian.net/browse/TIS21-4690 Private Beta feedback ?Potential Bug ticket to be raised but further looking at is required.- Cai to email GMC Data Apart from the above two tickets, is there anything else outstanding? What about the observation that the system is slow?- Investigation ticket to be raised if we don’t already have one( To be created after this planning session). AdHoc refinement.
|
2 | Other Tech improvement | Liaise with Andy Dingley re: https://hee-tis.atlassian.net/browse/TIS21-1209 |
3 | Post funding | Waiting https://hee-tis.atlassian.net/browse/TIS21-95 To be refined https://hee-tis.atlassian.net/browse/TIS21-4875 Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = https://hee-tis.atlassian.net/browse/TIS21-3273 - we queried the scope around delivery plan. Further conversation to fletch some things. Based on discussion around what our actual focus is. |
4 | Programme Membership | In flight https://hee-tis.atlassian.net/browse/TIS21-3785
|
5 | TIS assessment | |
6 | ESR | https://hee-tis.atlassian.net/browse/TIS21-213 (Tech Improvement) If there is capacity/willingness to refine: https://hee-tis.atlassian.net/browse/TIS21-4985 |
17 | Data work | From last iteration: https://hee-tis.atlassian.net/browse/TIS21-4838 https://hee-tis.atlassian.net/browse/TIS21-4620 -AdHoc Huddle https://hee-tis.atlassian.net/browse/TIS21-4612
|
11 | Retro actions | |
| LTFT discovery | Watching brief. Cross-team effort, involving Ade B in the first instance. What stage are we in now? research stage(ongoing) -Sending out invites for interviews https://hee-tis.atlassian.net/browse/TIS21-4417 Ade Babalola: LTFT Discovery Plan.xlsx
|
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Aug 16, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Steve (A/L) 16th to 18th of August
Jay (A/L) 24th and 25th of August
Cai (A/L) 21st of August
Bank Holiday: 28th of August
Non-Kanban work (this iteration):
Arrange a call with Revalidation leads ( Connections) to ascertain MVP
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | From last iteration: Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24 https://hee-tis.atlassian.net/browse/TIS21-4687(AdHoc) https://hee-tis.atlassian.net/browse/TIS21-4689 Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? https://hee-tis.atlassian.net/browse/TIS21-4864 -(AdHoc) |
| Support | Carried over… Review sync issues in Revalidation - next step = High Level Estimation https://hee-tis.atlassian.net/browse/TIS21-4956 Waiting https://hee-tis.atlassian.net/browse/TIS21-4952 https://hee-tis.atlassian.net/browse/TIS21-4928 (linked to MVP) |
1 | Revalidation - Connections | From last iteration: Private Beta in flight https://hee-tis.atlassian.net/browse/TIS21-4154 Private Beta waiting https://hee-tis.atlassian.net/browse/TIS21-4690 Private Beta feedback Apart from the above two tickets, is there anything else outstanding? What about the observation that the system is slow?- |
2 | Other Tech improvement | https://hee-tis.atlassian.net/browse/TIS21-4954 (preventative) AdHoc Continuing: https://hee-tis.atlassian.net/browse/TIS21-4862 (Cross-team) |
3 | Post funding | Waiting https://hee-tis.atlassian.net/browse/TIS21-95 To be refined https://hee-tis.atlassian.net/browse/TIS21-4875 Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = https://hee-tis.atlassian.net/browse/TIS21-3273 - we queried the scope around delivery plan. Further conversation to fletch some things. |
4 | Programme Membership | In flight https://hee-tis.atlassian.net/browse/TIS21-3785 TIS Assessment |
5 | Email Change | https://hee-tis.atlassian.net/browse/TIS21-4876 Can we have a session please to work out what next? Rob has an upcoming call with Stephen Loughran to get an email list if possible. |
6 | ESR | https://hee-tis.atlassian.net/browse/TIS21-213 (Tech Improvement) https://hee-tis.atlassian.net/browse/TIS21-4775 Blocked! There’s a blocker with built server - Raising ?a ticket??? cross-team???Not clear on the blocker-outside this planning. |
17 | Data work | From last iteration: https://hee-tis.atlassian.net/browse/TIS21-4838 https://hee-tis.atlassian.net/browse/TIS21-4612
|
11 | Retro actions |
|
| LTFT discovery | Watching brief. Cross-team effort, involving Ade B in the first instance. |
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Aug 2, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Pepe ~1-2 days TBA
James (A/L) 4th-11th
Steve (A/L) 7th-18th
Team catch up in LONDON 10.08.23
Rob AL 3/4 August
Non-Kanban work (this iteration):
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24 https://hee-tis.atlassian.net/browse/TIS21-4687 https://hee-tis.atlassian.net/browse/TIS21-4689
|
| Support | Helpful to understand and get a position on the perception that Recommendations is unstable. Suggestions on how to move this forward? Rob to raise a ticket? Spike, High level estimation to discuss around it. |
1 | Revalidation - Connections | From last iteration: Private Beta in flight https://hee-tis.atlassian.net/browse/TIS21-4154 Huddle to help progress this ticket ? Today Private Beta waiting https://hee-tis.atlassian.net/browse/TIS21-4690 Private Beta feedback Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net) >> Can we just give this a quick review, including updating recent feedback if applicable. Question >>> Are the above two tickets what has been ID’ed for the Private Beta? |
2 | Connections user research | Carried over from last Planning → Do we need to tidy up the revalidation material on Confluence? ?Team discussion and suggestion re: Reval materials on confluence? Rob started informally logging this and will share when advanced if that’s of interest? |
3 | Other Tech improvement | New: https://hee-tis.atlassian.net/browse/TIS21-4862 (Cross-team)
Continuing: |
| Post funding | From last iteration: In flight https://hee-tis.atlassian.net/browse/TIS21-4802 Waiting https://hee-tis.atlassian.net/browse/TIS21-95 To be refined https://hee-tis.atlassian.net/browse/TIS21-4875 ADHOC refinement ?today/tomorrow Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = https://hee-tis.atlassian.net/browse/TIS21-3273
|
4 | Programme Membership | Waiting https://hee-tis.atlassian.net/browse/TIS21-3785 are we intending to bring this in? It is refined and of medium effort.
? → There’s an improvement that @Joseph (Pepe) Kelly looked into about changing the way Conditions Of Joining (acceptance) are mapped - https://hee-tis.atlassian.net/browse/TIS21-4759 3 Amigo in this iteration. Not intending to do this work in this Iteration but it will be good to have it refined. |
| Email Change | Contended for High Level Estimation and to add related stories so these can be prioritised and developed for future work --- https://hee-tis.atlassian.net/browse/TIS21-4876 Friday HLE to scope out this work. P1 |
6 | ESR |
https://hee-tis.atlassian.net/browse/TIS21-213 (Tech Improvement) |
17 | Data work | From last iteration: https://hee-tis.atlassian.net/browse/TIS21-4838 https://hee-tis.atlassian.net/browse/TIS21-4612 https://hee-tis.atlassian.net/browse/TIS21-4688 https://hee-tis.atlassian.net/browse/TIS21-4620 - To be 3 Amigo’d on the completion of the 4838 |
11 | Retro actions | From last iteration: https://hee-tis.atlassian.net/browse/TIS21-4781 https://hee-tis.atlassian.net/browse/TIS21-4882 https://hee-tis.atlassian.net/browse/TIS21-4883
|
| LTFT discovery | cross-team effort, involving Ade B in the first instance. ? Need for team update regarding this work. |
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Jul 19, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Pepe on A/L 19.7.23 @14:00 to 21.7.23
Jay on A/L 20/7-21/7
Cai, Stan on 24/7
Steve 20/7
Non-Kanban work (this iteration):
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | https://hee-tis.atlassian.net/browse/TIS21-4687 https://hee-tis.atlassian.net/browse/TIS21-4689 Live Defect: 19.7.23 ticket to be created. |
1 | Revalidation - Connections | In flight
MVP improvements ready https://hee-tis.atlassian.net/browse/TIS21-4690 MVP improvements from feedback Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net) Assume 4548 makes this ticket unnecessary for the time being? #8 > Bring in https://hee-tis.atlassian.net/browse/TIS21-4154 Now that the spike has been completed can this ticket be revise, refined and put in. |
2 | Connections user research | Proactively seek additional feedback. from users on the UR channel, UR to continue to ensure users are engaging with regular updates on Teams. Carried over from last Planning → Do we need to tidy up the revalidation material on Confluence? ?Team discussion and suggestion re: Reval materials on confluence? Rob started informally logging this and will share when advanced if that’s of interest?
|
3 | Other Tech improvement | |
| Post funding | https://hee-tis.atlassian.net/browse/TIS21-4802 https://hee-tis.atlassian.net/browse/TIS21-95 get refined and lined-up (ADHoc? Today or tomorrow) https://hee-tis.atlassian.net/browse/TIS21-4805 for investigation
Can we create a UR channel and add the Leads and other participants so we can get QA as appropriate? Rob happy to set this up to follow previous precedent. Lunch and learn to be arranged: Catherine to put in team’s calendar |
4 | Programme Membership | https://hee-tis.atlassian.net/browse/TIS21-3785 are we intending to bring this in? It is refined and of medium effort. There’s an improvement that @Joseph (Pepe) Kelly looked into about changing the way Conditions Of Joining (acceptance) are mapped - was this done? https://hee-tis.atlassian.net/browse/TIS21-4759 3 Amigo in this iteration. |
| Email Change | ? Spike for an investigation: How do we update TIS admin and revalidation email to the current NHS.NET email: Get a call with the team: Catherine to arrange. |
6 | ESR | Prevent irreparable loss of the ESR interface due to MongoDB Atlas contract not being in place from 1st Aug. Rob supporting with this query https://hee-tis.atlassian.net/browse/TIS21-213 (Tech Improvement) conversation on how we achieve the goal of this ticket- we have a blocker: internal blocker - ensure token has the necessary access Do we have a blocker with this ticket due to its length of stay? Do we need extra pair of hands to help move this ticket on? |
17 | Data work | https://hee-tis.atlassian.net/browse/TIS21-4612 https://hee-tis.atlassian.net/browse/TIS21-4688
|
11 | Retro actions | |
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Jul 5, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Stan (A/L) 5th - 7th of July
Pepe (A/L) 6th July + probably 11th/12th July
Non-Kanban work (this iteration):
Pen Test planning in light of Connections release? Not required.
Rob / Catherine to check up on preferences for London DB merger and support for bulk upload re connections with GMC.
Work lined up for the iteration |
---|
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | |
1 | Revalidation - Connections | In flight https://hee-tis.atlassian.net/browse/TIS21-4548
MVP improvements ready https://hee-tis.atlassian.net/browse/TIS21-4574
MVP improvements from feedback Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net) #13 > https://hee-tis.atlassian.net/browse/TIS21-4662 (this is a fault/bug)(P1) #6 > Send to GMC comes up as “Save”, but should be “Submit” so it’s clear what's happening? Create new ticket and to be 3 Amigo with Steve ?today #7 > Bring in https://hee-tis.atlassian.net/browse/TIS21-4526 – To create a new ticket for a specific filter which is addressing programme owner(P2) #9 > Dummy record removal https://hee-tis.atlassian.net/browse/TIS21-4690 #8 > Bring in https://hee-tis.atlassian.net/browse/TIS21-4154 Creating of Spike ticket
MVP outstanding --- these have gone back to the backlog. Are they necessary for MVP? https://hee-tis.atlassian.net/browse/TIS21-4040 https://hee-tis.atlassian.net/browse/TIS21-4039 Aim to get two above tickets refined this Iteration? *** can we go through the five Epics and ID any tickets not done and work out whether the still have legs? Mini backlog refinement of MVP related. Catherine and Rob to take time and go through this. |
2 | Connections user research | Proactively seek additional feedback. from users on the UR channel, UR to continue to ensure users are engaging with regular updates and emails Do we need to tidy up the revalidation material on Confluence? ?Team discussion and suggestion re: Reval materials on confluence |
3 | Other Tech improvement | Generate stories from MongoDB: @Joseph (Pepe) Kelly to create tickets out of this.
|
4 | Programme Membership | https://hee-tis.atlassian.net/browse/TIS21-2403 https://hee-tis.atlassian.net/browse/TIS21-3785 There’s an improvement that @Joseph (Pepe) Kelly looked into about changing the way Conditions Of Joining (acceptance) are mapped |
| Bulk uploads |
|
5 | Post funding UR | Can we get some priority tickets developed so they can be lined up, please? Catherine, James, Ade B and Ade A, Rob etc. Arrange an hour conversation to work out priority tickets. |
6 | ESR | https://hee-tis.atlassian.net/browse/TIS21-213 (Tech Improvement) conversation on how we achieve the goal of this ticket- we have a blocker: internal blocker - ensure token has the necessary access |
17 | Data work | https://hee-tis.atlassian.net/browse/TIS21-4612 |
11 | Retro actions | https://hee-tis.atlassian.net/browse/TIS21-4751 Plus to be added from yesterday’s session. |
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Jun 20, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Cai (A/L) 26th- 30th of June
Steve (A/L) 23rd of June
Pepe (A/L) 26th -29th of June (TBC)
James H (A/L)29th-3rd of July
Rob (A/L) prob 26-27 June (TBC)
Non-Kanban work (this iteration):
ESR meeting TBA (Rob leading on this)
GMC meeting - cover-off London DB merger, the stage update and support for bulk connections.
Pen Test planning in light of Connections release?
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | https://hee-tis.atlassian.net/browse/TIS21-4687
|
1 | Revalidation - Connections | In flight Cai and Yafang meeting after planning.
MVP improvements ready
MVP outstanding (when are these necessary to be done)?
MVP improvements from feedback Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net) #6 > Send to GMC comes up as “Save”, but should be “Submit” so it’s clear what's happening? #9 > Dummy record removal #7 > Bring in – ? Is this dependent on further insights? #8 > Bring in Would need to be refined. #13 > (ADHOC refinement as a matter of urgency?)
|
2 | Connections user research | Get outputs from the UR sessions analysed and socialised so we can confirm suggested improvements and join up with Teams feedback. User journey outputs? Dependency on insights then to plan team feedback session. |
3 | Tech improvement | Generate stories from MongoDB: @Joseph (Pepe) Kelly suggesting to create tickets out of this? And this aim to come in in this Iteration?
Book second day
|
4 | Programme Membership | (should be mostly Reviews) |
| Bulk uploads | James would like us to consider these… They are dependent on 2403 (I think). Opinions? → is this a bug?
Are we in a position to bring these in? At least to get them refined so they can be lined up. |
5 | Post funding UR | Can we get some priority tickets developed so they can be lined up, please? |
6 | ESR | (Tech Improvement) conversation on how we achieve the goal of this ticket- we have a blocker: internal blocker - ensure token has the necessary access KSS ESR issue(s) to be investigated. |
17 | Data work | Dependency on 4688
|
11 | Retro actions |
|
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
Jun 7, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
James Harris (A/L) 6th to the 9th of June
Pepe (A/L): Wed 7th (Today) pm
Jay (A/L) half day on Friday 9th June
? Rob (A/L) next week (TBC)
Non-Kanban work (this iteration):
ESR meeting TBA (Rob leading on this)
Work lined up for the iteration |
---|
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect |
|
1 | Revalidation - Connections | This Iteration: Bring in – this needs to be refined. It will address a shortfall in usability of the Discrepancy list by having a default filtering by DB. It will also introduce filtering from which we can iterate based on feedback. Need to review the user research and cycle round any improvements ASAP. These may occur in these two weeks. >>> Carry on with logic tickets. Do we need to review and clear tickets no longer required etc. (3 Amigos) on the logic tickets this iteration. >>> Get three teams on production, which should happen today. |
2 | Connections user research | We need an epic created for this work, so that we can capture and ticket-up things that we agree need to be done either as part of immediate improvement, or for later prioritisation. Capturing UR work / integrating it into JIRA. Ade B: |
| Stage environment | Is there anything we need to do on Stage to synchronise with the GMC update of their Test system? Would need planning and refinement re: GMC update of stage environment. |
| TIS | Monitoring and Logging ticket - add Sentry to TCS (& Reference). |
3 | Tech improvement | MongoDB: Updating docs & planning with external expertise to do a subset of:
|
4 | Programme Membership | (should be mostly Reviews) |
| Bulk uploads | James would like us to consider these… They are dependent on 2403 (I think). Opinions? |
5 | Post funding UR | When James is back it would be very helpful to start to develop and refine the related user stories, with their priority. |
6 | ESR | (Tech Improvement) conversation on how we achieve the goal of this ticket- no current blocker |
17 | Data work |
|
11 | Retro actions | Links in with (2)Connections user research
|
12 | Roadmap review | TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
May 24, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Ade A (A/L) 25/5/23
James Harris (A/L) 6/6/23
Rob (A/L) Fri 26 and Tues 30th
Bank Holiday: 29th of May 2023
Non-Kanban work (this iteration):
Discussions: Reval Leads-connection update
Speaking with Wales about what TIS does. Wales are considering alternatives to Intrepid (which was used by HEE & NI before moving to TIS)- Planning to meet again 1st of June
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect |
|
1 | Revalidation - Connections | This Iteration:
>>> Carry on with logic tickets. Do we need to review and clear tickets no longer required etc. (3 Amigos) on the logic tickets this iteration. >>> Have we picked up any other immediate priorities that we need to resolve this iteration?- Clarifying on discrepancies list(for further discussion) >>> Need to get all Leads on Stage >>> Prep for one/two teams as early adopters. |
2 | Connections user research | Can we create an Epic to frame this work? Covers user research and the any improvements that come out of this? This will help with vis |
3 | Tech improvement |
|
4 | Programme Membership |
(should be mostly Reviews)
|
5 | Post funding UR | Session with team on Post Funding (retro action) Going through needs based on categorisation Work to start to develop user stories within the Epic. Ade B, James, Catherine and Rob etc( to be considered for next iteration) |
6 | ESR | (Tech Improvement) conversation on how we achieve the goal of this ticket- no current blocker |
17 | Data work |
|
11 | Retro actions |
? to be discussed with team then( To link this with Stan’s planned work around our Jira dashboard) : Ade B to guide on this on post funding.
|
12 | Roadmap review | TIS Admin product roadmap.pptx
Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)? |
.
May 10, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Yafang15th -19th of May
Bank Holiday: 29th of May 2023
Non-Kanban work (this iteration):
Review survey results. Can we get a call in with Team?
Discussions: Need to get a call in with the team to move work on user management with Ade B and Catherine_ to confirm a date?
Speaking with Wales about what TIS does. Wales are considering alternatives to Intrepid (which was used by HEE & NI before moving to TIS)-
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect |
|
1 | Revalidation - Connections | This Iteration:
-Epic? Is this post MVP improvement work led by the UR and prob FE too.
|
3 | TIS (Infrastructure) |
|
4 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. liaising with Trainee team re-moving this tickets forward Clause: currently not refined- Cross team refinement For Yafang and Pepe + trainee team COJ- trainee team are currently working along side tickets in questioned ? Trainee team need to unblock work to prioritise in order to allow Admin to move work on- Encourage trainee team to bring ? tickets into their own iteration~ |
7 | Technical improvement |
|
9 | Post funding UR | User mapping has been done and will be shared with the Team. Joint working with Data analyst to review feedback of our users Research plan also to do: to be completed upon Alpha phase Focus work on this iteration : Post funding, reviewing phase of user feed back
|
10 | Retro actions |
|
11 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx
Explode-out revalidation to produce a Revalidation Roadmap |
Apr 25, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Stan (A/L) 25-28th April
? Rob (A/L) 5th May
Bank Holiday: 1st of May and 8th of May
Non-Kanban work (this iteration):
Review survey results. Can we get a call in with Team?
Discussions: Need to get a call in with the team to move work on user management 27/4/23 with Ade B and Catherine
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect |
|
1 | Revalidation - Connections | This Iteration:
|
3 | TIS (Infrastructure) | Ongoing work with Pepe |
4 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. liaising with Trainee team re-moving this tickets forward Clause: currently not refined- Cross team refinement For Yafang and Pepe + trainee team
|
7 | Technical improvement | High-Level plan & refinement for ESR on ECS work… (@Jayanta Saha) There is some additional Tech Improvement that doesn’t directly involve services for the Connections MVP similar to Tech team sharing |
9 | Post funding UR | User mapping has been done and will be shared with the Team. Research plan also to do. Focus work on this iteration : Post funding, gathering user feedback~
|
10 | Retro actions |
|
11 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Apr 12, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Stan(Paternity) 12-18th April
Stan (A/L) 19th-25th April
Cai (A/L) 12th- 14th of April
Steve (A/L) 13th-14th of April
Bank Holiday:
Non-Kanban work (this iteration):
Review survey results. Can we get a call in with Team?
Discussions: Need to get a call in with the team to move work on user management
Work lined up for the iteration | ||
---|---|---|
0 | Live Defect | … Just RCA & Actions left? |
1 | Revalidation - Connections | This Iteration:
Last Iteration:
- next work in line (for refinement) Team meeting to go through Logic tickets and ? re-prioritise as needed and we should put additional tickets into the Ready for Development pile so they can be taken in as required. Currently there is only one ticket
|
3 | TIS (Infrastructure) | Ongoing work with Pepe and the team |
4 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. liaising with Trainee team re-moving this tickets forward Clause: currently not refined- For Admin team to liaise with trainee team re: tickets
|
7 | Technical improvement | High-Level plan & refinement for ESR on ECS work… (@Jayanta Saha)
Not refined but need to do (sorry from @Joseph (Pepe) Kelly ): |
9 | Post funding UR | User mapping has been done and will be shared with the Team. Research plan also to do. Start the research: Ongoing work |
10 | Retro actions |
this work to be linked with Stan’s Jira Dashboard
|
11 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Mar 29, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Stan(Paternity) 3rd-18th April
Jay (A/L) 13th –31st March
Pepe 4th April TBC
Ade A (A/L) 27th – 31st March
Rob 30th and 31st of March
Easter holiday- 7th and 10th April
Non-Kanban work (this iteration):
Review survey results. Can we get a call in with Team?
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
1 | Revalidation - Connections | - next work in line (for refinement) Devs Team meeting to go through Logic tickets and ? re-prioritise as needed |
2 | Merger |
|
2 | Revalidation Connections - Overview | Summary of work done and work to do - formation of a delivery plan
|
|
|
|
3 | Certification |
|
4 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. ? |
5 | Bulk Upload |
|
6 | Data work |
|
7 | Technical improvement |
|
8 | Revalidation reporting research / discovery | In progress → UR - Resolve Alpha approach |
9 | Post funding UR | Research plan and user mapping Start the research: Ongoing work |
10 | Retro actions |
|
11 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Mar 15, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
Ade A (A/L) 13th -17th March
Stan(A/L) 13th -17th March
Jay (A/L) 13th –31st March
Yafang (A/L) 20th – 24th March
Pepe 22nd-28th March
Ade A (A/L) 27th – 31st March
Non-Kanban work (this iteration):
Review survey results. Can we get a call in with Team?
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
1 | Revalidation - Connections | - next work in line (for refinement) |
2 | Merger |
|
2 | Revalidation Connections - Overview | Summary of work done and work to do - formation of a delivery plan |
|
|
|
3 | ESR | Ready → File management → |
4 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. ? |
5 | Bulk Upload |
|
6 | Data work |
|
7 | Technical improvement |
|
8 | Revalidation reporting research / discovery | In progress → UR - Resolve Alpha approach |
9 | Post funding UR | Research plan and user mapping Start the research |
10 | Retro actions |
|
11 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Mar 1, 2023
Goal(s) for the next Iteration:
Statement: Revalidation Connections MVP
Team availability (e.g., Leave & Events):
User Research Sessions - a number of the team
James H (A/L) 27 Feb- 3rd March
Cai(A/L) 6th -10th of March
Ade A (A/L) 13th -17th March
Stan(A/L) 13th -17th March
Jay (A/L) 13th –31st March
Jay 10th March
Cai 3rd March
Non-Kanban work (this iteration):
Collate ESR work, specifically list of issues. Planning to get a call in. Rob/?Pepe Should happen in the next two weeks, but keeps being bumped. Would like to review Stan’s work as that may help frame the first meeting with ESR Leads.
Review survey results. Can we get a call in with Team.
Work lined up for the iteration |
---|
Work lined up for the iteration | ||
---|---|---|
1 | Revalidation - Connections | - next work in line (for refinement) Look at from infrastructure Epic (M effort) |
2 | Revalidation Connections - Overview | Epic summary (2 done and 1 in BL -3734) (1 done and 2 BL - 3772 and 3769) (1 done and epic completed) (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***) (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above). Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 >>> the prerequisite is getting the epics completed. <<< |
3 | Revalidation reporting research / discovery | In progress → UR - Next step Alpha? This is primarily data/ user research/? usability testing work so assume no impact on developers (is this a correct assumption)- |
4 | ESR | Ready → File management → |
5 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. |
6 | Bulk Upload | |
7 | Data work | ESR reporting →
|
8 | Technical improvement |
|
9 | Retro actions |
(new) Fiaz liaison →
|
10 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Feb 15, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
User Research Sessions - a number of the team
Pepe A/L 7 Feb-20th Feb
Steve A/L 13 Feb -17th Feb
Non-Kanban work (this iteration):
Post funding. Planning to get a call in with James, Ade B, Ade A and Rob
Collate ESR work, specifically list of issues. Planning to get a call in. Rob/?Pepe
Review survey results. Meeting to be planned in to discuss findings with the involvement
Work lined up for the iteration | ||
---|---|---|
1 | Revalidation - Connections | - next work in line (for refinement) Look at from infrastructure Epic (M effort) |
2 | Revalidation Connections - Overview | Epic summary (2 done and 1 in BL -3734) (1 done and 2 BL - 3772 and 3769) (1 done and epic completed) (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***) (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above). Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 >>> the prerequisite is getting the epics completed. <<< |
3 | Revalidation reporting research / discovery | In progress → UR - Next step Alpha? This is primarily data/ user research/? usability testing work so assume no impact on developers (is this a correct assumption)- |
4 | ESR | Ready → File management → |
5 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. |
6 | Bulk Upload | |
7 | Data work | ESR reporting → Stan to create Bug ticket as a follow on work in the iteration.
|
8 | Technical improvement | Trainee team ticket we need sight of → |
9 | Retro actions | (new) Workshop for Jira → (new) Fiaz liaison →
|
10 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Feb 1, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
User Research Sessions - a number of the team
Anita on A/L 2nd Feb -10 Feb
13 Feb on A/L
Rob to confirm A/leave next week?
Pepe A/L 7 Feb-20th Feb
Everyone: Hack Retro TBC
Non-Kanban work (this iteration):
Post funding. Planning to get a call in. y
Collate ESR work, specifically list of issues. Planning to get a call in. y
Review survey results (pre-refinement/refinement this iteration). Perhaps Stan can help with result analysis? y
Work lined up for the iteration | ||
---|---|---|
1 | Revalidation - Connections | Complete → Will this unblock the rest of Connections. If so, what next? Investigation - next work in line (for refinement) Look at from infrastructure Epic (M effort) |
2 | Revalidation Connections - Overview | Epic summary (2 done and 1 in BL -3734) (1 done and 2 BL - 3772 and 3769) (1 done and epic completed) (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***) (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above). Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 >>> the prerequisite is getting the epics completed. <<< |
3 | Revalidation reporting research / discovery | In progress → UR - Next step Alpha? This is primarily data work so assume no impact on developers (is this a correct assumption)- |
4 | ESR | Ready → File management → |
5 | Programme Membership | Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. |
6 | Bulk Upload | |
7 | Data work | ESR reporting → Stan to create Bug ticket as a follow on work in the iteration. |
8 | Technical improvement | Trainee team ticket we need sight of → |
9 | Retro actions | Review attendance → (new) Workshop for Jira → (new) Fiaz liaison →
|
10 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Jan 18, 2023
Goal(s) for the next Iteration:
Statement:
Team availability (e.g., Leave & Events):
User Research Sessions - a number of the team
Everyone: Hack Day
Non-Kanban work (this iteration):
Recruitment (Tracker) and update from Anita…
Post funding. ?
Collate ESR work, specifically list of issues. (Rob)
NI investigation. Ongoing. (Rob)
GMC show and tell - are there thoughts around this?
Want to resurrect user satisfaction survey, but unsure of timings.
Review survey to go out. Perhaps Stan can help with result analysis?
Work lined up for the iteration | ||
---|---|---|
1 | Revalidation - Connections | Ready → Maven workflow → Agree to rapidly refine and put at the top of Ready for Development so it is worked on first. Then once 3774 is advanced work through what else is brought onto the Kanban. Look at from infrastructure Epic (M effort) |
2 | Revalidation Connections - Overview | Epic summary (2 done and 1 in BL -3734) (1 done and 2 BL - 3772 and 3769) (1 done and epic completed) (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***) (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above). Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 |
3 | Revalidation-related | Ready → Testing → |
4 | Revalidation reporting research / discovery | In porgress → UR - |
5 | ESR | Ready → File management → |
6 | Programme Refactoring | to be refined prob Yafang, James and Reuben |
7 | Data work | In progress ESR reporting → ESR reporting → Revalidation and Metabase → |
8 | Technical improvement | We’ve got a couple of stories related to Live Defects. We’ll focus on those and the tech platform for Connections. |
9 | Retro actions | Onboarding → Hack day → Review attendance → (new) Workshop for Jira → (new) Fiaz liaison →
|
10 | Roadmap review | Can we just sense check? TIS Admin product roadmap.pptx Explode-out revalidation to produce a Revalidation Roadmap |
Slack: https://hee-nhs-tis.slack.com/
Jira issues: https://hee-tis.atlassian.net/issues/?filter=14213