You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 15
Next »
Availability
(assume Team Availability Calendar is up to date, otherwise, everyone is available for 9 days):
Joanne Ify Ola Panos Chris | -3.5 -1 -3 -7 -4 |
---|
Sprint Priorities
The following list was the prioritisation output from Sprint Planning - largely a stabilisation Sprint:
- BAU - POs to review what are P1s in Jira as a matter of urgency. To include:
- Rotations ID being saved rather than Rotation name / Make Rotation name a read only field
- One London office can't create posts (Chris / John G and Sunil) TISDEV-4854
- Technical debt +
- 15 votes: Increase team knowledge of TIS big picture
- 14 votes: Testing so we can release with confidence
- 12 votes: Pipeline replacement
- 12 votes: E2E test coverage (ESR)
- 11 votes: Filming the team – this is who we are!
- 10 votes: Integration tests
- 9 votes: Clearly define a domain model – a clear representation of what TIS is
- Replacing jHipster front end code
- TIS NDW mappings
- Knowledge transfer
- Confluence housekeeping - especially deleting documentation that is out of date
- Coding standards (Dev meeting / series of meetings)
- Pairing / Mobbing
- Git-commit messages
- Walk-throughs (prep as you go).
- Architectural level diagrams (this is a GROUP activity not a lonely boring task)
- Development (P1s - POs to review what are P1s in Jira as a matter of urgency)
- Assessments – continuing work (Paul)
- Placement comments - P1s in Next Up (Suneet)
- Removal of deleted records (Alice confirmed)
- NDW UAT feedback analysis – Product team (support needed once HiCom turn on the TIS-Intrepid ETL to switch on their modules - Friday?)
- Discovery/research – replacements for HICOM modules (CPPS, Placement Manager, Leave Manager, CBMS) and trust and trainee portal - Product team (Rob to confirm priorities within this)
- Sub-specialty (fixed on dev - check just waiting for release - Ola)
- Mapping metadata from the document management import (Luis)
- People / Posts paramatised - TISDEV-4926 (1 day Spike) / TISDEV-4927 (long term solution to Paul's prototype) / WAF / Analysis around sanitiser
- ESR (DevOps) needs refactoring (Fred)
- DR planning - incl. geo-replication, roll back and build again scenarios (John S and Ops)
Contents
The following items to be shared by team members during this sprint review
Item | Owner | Description of work | Link. e.g. to working software https://apps.tis.nhs.uk/ (note: use Dev for obfuscated data) | Loom video of completed work https://www.useloom.com/ |
---|
Production Application releases / updates
| | Releases - TIS-49 - Includes upgrade of Admins-UI to Angular 5
|
|
|
BAU (incl. Rotations ID being saved rather than Rotation name / Make Rotation name a read only field, and One London office can't create posts TISDEV-4854 (Chris / John G and Sunil)) |
|
|
|
|
Technical debt + - 15 votes: Increase team knowledge of TIS big picture
- 14 votes: Testing so we can release with confidence (incl. E2E tests - ESR and Integration tests)
- 12 votes: Pipeline replacement
- 11 votes: Filming the team – this is who we are!
- 9 votes: Clearly define a domain model – a clear representation of what TIS is
- Replacing jHipster front end code
- TIS NDW mappings
| Paul | - started to increase the test coverage of the Assessment service
|
|
|
Knowledge transfer - Confluence housekeeping - especially deleting documentation that is out of date
- Coding standards (Dev meeting / series of meetings)
- Pairing / Mobbing
- Git-commit messages
- Walk-throughs (prep as you go).
- Architectural level diagrams (this is a GROUP activity not a lonely boring task)
|
- Former user (Deleted) / Ruth Orhiunu (Unlicensed) / All Dev team
- All Dev team
- All Dev team
- All Dev team
- All Dev team
- Reuben Noot (Deactivated) / All Dev team
- Frederic Randriamora (Unlicensed)
| Paul - Knowledge transfer session on the Assessment service, history, complications, reasons and design choices
- TISConf!
Jag - Knowledge transfer sessions for ESR for the team.
- Documented additional technical/Dev level details on the project.
Jayanta (KR) - Identified the potential KT areas such as NDW ETL, Document Management, ESR, Bulk upload etc.for collecting knowledge.
- On going KR is going on NDW ETL, ESR, Assessment , Bulk upload and Big picture of TIS.
- Organising the KT sessions with the respective KD and the permanent team members.
- Documenting knowledge so that team members can act on it when necessary.
- Bulk upload ticket on Placement ID as matching criteria.
| Assessments Application
NDW ETL Setup |
Jag: https://github.com/Health-Education-England/TIS-ESR-ETL Ashley: ESR-ETL Timings: ETL Timings |
Development (P1s - POs to review what are P1s in Jira as a matter of urgency) - Assessments – continuing work
- Placement comments - P1s in Next Up
- Removal of deleted records (Alice confirmed)
- NDW UAT feedback analysis – Product team (support needed once HiCom turn on the TIS-Intrepid ETL to switch on their modules - Friday?)
- Discovery/research – replacements for HICOM modules (CPPS, Placement Manager, Leave Manager, CBMS) and trust and trainee portal - Product team (Rob to confirm priorities within this)
- Sub-specialty (fixed on dev - check just waiting for release)
- Mapping metadata from the document management import
- People / Posts paramatised - TISDEV-4926 (1 day Spike) / TISDEV-4927 (long term solution to Paul's prototype) / WAF / Analysis around sanitiser
- ESR (DevOps) needs refactoring
- DR planning - incl. geo-replication, roll back and build again scenarios
| | Paul - With the Reasons ETL complete for Assessment Outcome Reasons, worked with Fred to run it on DEV - waiting the required changes on the FE to release at the same time
- Added support to the Assessments service to allow for the deletion of assessments and all relating entities (Pre/Post assessment - reasons etc - currently backend only)
Ola - Assessments - Pre assessment details logic updated in FE to retrieve CurriculumSpecialty and CurriculumSubType data for records that currently have it missing
- Post - Updated FE logic to ensure the rendering of Funding body name
- Placements - Tested applied fix for Sub-specialty field issue on Stage with Joanne Watson (Unlicensed), fix pushed to Prod after success
9. Jag/Fred - Migration of crontab FTP Sync job to Jenkins job has been tested. The cron job is flexible handling only the required files and factoring the time. MTP pending.
- An additional manual FTP sync Jenkins job has been created giving the flexibility of filtering by individual local office and file types.
Jag: Looked in to some issues raised by ESR. - National Insurance rollout and format issue.
- Site known as instead of VPD code.
- Hicom backlog files processing.
- LOV mismatch warning. (TISDEV-5001)
- few other bau issues
|
| https://www.useloom.com/share/30b62ba412464620a69c1623d70f72fd
9. Jag/Fred https://build.tis.nhs.uk/jenkins/job/tis-esr-ftpsync-cron-stage/ https://build.tis.nhs.uk/jenkins/job/tis-esr-ftpsync-manual/
|
Resource Planning | | Agency update Advert gone out for two BA roles (London-based) to give us a head-start on recruiting TIS Team #2, which will be an outside of London-based team. Full Time recruitmentNo joy with the final FED role as yet. OtherRuth left us |
|
|
Add Comment