Comment: Site approvals in bulk

...

Process Name

AP-1 Create / Add Site Approvals

Comments
DescriptionAdmins are to complete that a site is approved within the reference table to make it available for use as a site for a post/placement
ActorsHEE Admins (Any Roles with access to create/update sites)
Pre-Conditions

Site approval period is coming to an end or is not approved at present.


Post-Conditions

A new/existing & approved site is added or amended to the Site reference table list

When Adding placements, user should be able to use the new approved Site.


Process Steps
  1. Navigate to Site list
  2. Select Site to edit or create site
  3. Fill in relevant fields and approvals dates from and to 
  4. Update/Set status to Current (if required)
  5. Link historical sites (if applicable) NOT FOR MVP Post - MVP
  6. Save


Alternative ProcessAP-2 Remove site approval
Rules
  • Site must be approved to become available for use within a post/placement - this is known by the approvals from/to date being valid (i.e. not expired)

JIRA Links
Jira Legacy
serverSystem JIRA
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTISNEW-3465

Audit LogN/A



Process Name

AP-1A Create / Add Site Approvals in Bulk

Comments
DescriptionAdmins are to complete that a site is approved within the reference table to make it available for use as a site for a post/placement in bulk, i.e. multiple sites as a time
ActorsHEE Admins (Any Roles with access to create/update sites)
Pre-Conditions

Site approval period is coming to an end or is not approved at present.


Post-Conditions

Existing Site is appended with approval details to the Site reference table

When Adding placements, user should be able to use the new approved Site. - Post MVP


Process Steps
  1. Navigate to bulk uploads area
  2. Select the appropriate template to download and fill for Sites Approvals
  3. Fill in relevant fields and approvals dates from and to
  4. Update/Set status to Current (if required) - Post MVP
  5. Link historical sites (if applicable) NOT FOR MVP Post - MVP
  6. Upload the template to TIS
  7. Sites updated with dates


Alternative ProcessAP - 1
Rules
  • Site must be approved to become available for use within a post/placement - this is known by the approvals from/to date being valid (i.e. not expired) - Post MVP
  • Approved from and to dates are added/amended to existing sites - MVP

JIRA Links<<Ticket here>>>
Audit LogSite last amended/added by who and when.



Process Name

AP-2 Edit/Remove site approval

Comments
DescriptionAdmins are to complete that a site is no longer approved within the reference table to make it unavailable for use as a site for a post/placement
ActorsSystem Admin
Pre-Conditions

Site approval date is expired that needs to be updated

Site has got no start and end dates


Post-Conditions

Site is unavailable for use within Posts / Placements? Post - MVP

Site is updated with the dates


Process Steps
  1. Navigate to site list
  2. Select site to edit or create site
  3. Make necessary changes
    1. Change status to inactive to deactivate or
    2. amend start date or
    3. amend end date
  4. Save

Should anything else be done to remove approval? I suppose as long as we can tie off the dates that is enough.

Should site approval be stored historically? Yes although not sure how this would work as we just recording dates?

Alternative ProcessAP-1 Create / Add Site Approvals
Rules
  • once  site has been made inactive, it should not be available to add to posts
  • warn users about already linked posts/placements ? Post - MVP

What should happen to a post/placement that is already linked to a site that becomes expired or is no longer approved? Nothing for MVP


Should a user be able to see which posts/placements are linked here so they can amend them? Not for MVP

JIRA Links
Jira Legacy
serverSystem JIRA
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTISNEW-3465

Audit LogN/A

...