Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Sprint goals review with team feedback



Sprint Goal

  • Resolve the specialty bug which caused the deletion of post specialties
  • Deploy the new Reval app to a public URL for Reval Admins to browse and feedback
  • Continue the support of the extended ESR pilot


Live Issues:

Any live defects or interruptions? Any committed-to tickets were moved out as a result

Incident Logs

2020-04-16 Users not able to login - too many DB connections

2020-04-14 20,000 Post Specialities Missing

2020-04-23 Bulk Post create - setting Auto-generate flag ON instead on Manual

Between Sprints: 

Jira Legacy
serverSystem JIRA
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTISNEW-4217

Jira Legacy
serverSystem JIRA
columnstype,summary,story points (effort),assignee,created,status
maximumIssues20
jqlQueryproject = TISNEW AND issuetype in (LiveDefect, Support) AND Sprint = 334 order by created DESC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7

Between Sprints: 

Jira Legacy
serverSystem JIRA
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTISNEW-4217

Incident Logs

2020-04-14 20,000 Post Specialities Missing

2020-04-16 Users not able to login - too many DB connections

2020-04-23 Bulk Post create - setting Auto-generate flag ON instead on Manual


.

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')

AreaSquadTeam RepresentativeDemo - from Prod URL where feasible

ESR:

  1. Continue the support of the extended ESR pilot
  2. Operational update on anything ESR related
ESR

Where we were at the start of the sprint:

Where we are now:


Revalidation:

  1. Deploy the new Reval app to a public URL for Reval Admins to browse and feedback
Reval

Where we were at the start of the sprint:

Where we are now:

TIS:
  1. Resolve the specialty bug which caused the deletion of post specialties
  2. Operational update on anything TIS related
TIS

Where we were at the start of the sprint:

Where we are now:


Other



Where we were at the start of the sprint:

Where we are now:




Priorities

  • Next Sprint
  • Overall



Post-Sprint Review survey: https://www.surveymonkey.co.uk/r/5RRM8HG