Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Sprint goals review with team feedback



Sprint Goal

  • Reval Team: Rebuild the Reval Stage environment as code so it can be rebuilt on demand and a Prod environment can be built |
  • Core TIS Team: As a TIS Admin, I want to be able to record the new outcome 10 as a result of COVID. As a trainee, I can complete section 1 of form R part B
  • ESR Team: Generate (Type 1) notifications for placements


Live Issues:

Any live defects or interruptions? Any committed-to tickets were moved out as a result

Jira Legacy
serverSystem JIRA
columnstype,summary,created,status
maximumIssues20
jqlQueryissuetype in (LiveDefect, Support) AND project = TISNEW AND Sprint = 335 ORDER BY created ASC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7

Incident Logs

2020-05-04 PersonOwner job failed affecting local office filters


.

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')

SquadAreaTeam RepresentativeDemo - from Prod URL where feasible

ESR





Revalidation:


TISForm R, Part B, Section 1 - Doctor Details

Assessments - recording an Outcome 10.1 or 10.2

Unable to bulk upload rotations

Programme Curriculum Completion Date calculated incorrectly in NDW ETL


TIS Sync - skeleton handler service



TIS Sync - Azure MySQL syncing with Auora

TIS InterrfaceSecurity Vulnerability

PersonOwner job failed 08:27 - Users unable to see their trainees unless they remove the local office fitlers

Other






Priorities

  • Next Sprint
  • Overall



Post-Sprint Review survey: https://www.surveymonkey.co.uk/r/5RRM8HG