Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Sprint goals review with team feedback



Sprint Goal

  • Resolve the specialty bug which caused the deletion of post specialties
  • Deploy the new Reval app to a public URL for Reval Admins to browse and feedback
  • Continue the support of the extended ESR pilot


Live Issues:

Any live defects or interruptions? Any committed-to tickets were moved out as a result

Jira Legacy
serverSystem JIRA
columnstype,summary,created,status
maximumIssues20
jqlQueryproject = TISNEW AND issuetype in (LiveDefect, Support) AND Sprint = 334 order by created DESC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7

Incident Logs

2020-04-14 20,000 Post Specialities Missing

2020-04-16 Users not able to login - too many DB connections

2020-04-23 Bulk Post create - setting Auto-generate flag ON instead on Manual


.

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')


AreaSquadTeam RepresentativeDemo - from Prod URL where feasible

ESR


Continue the support of the extended ESR pilot

  • 1. Documentation / supporting the core TIS Team with the synchronisation between TIS and TIS Self Service as the solution is likely to based on similar technology that is used in the ESR bi-directional solution and being used in the pilot.
  • 2. Service Stability - ensuring that some of the services that run, if there is a connection issue they automatically reconnect. 
  • 3. Message retieval retrieval for the auditing service - If there is an issue and some investigation is required, this provides the ability to pull complete audit message records from the EsrAudit service database to support investigations
  • 4. Investigating missing app records for Milton Keynes
ESRPhil James (Unlicensed)

Review of pilot output

View file
nameTest summary.docx
height250

Revalidation:
  1. Deploy the new Reval app to a public URL for Reval Admins to browse and feedback
Reval

Where we were at the start of the sprint:

  • We did not have the public URL ready for Reval so that users could have a look and give us feedback.
  • We enhanced the summary page by adding sorting, pagination and reset trainees list features on our local machines.

Where we are now:

  • We
managed to deploy
  • successfully deployed a public URL for the users
and we are going to
  • - demo
it
  • We enhanced the summary page by adding search and filtering features - demo.

The URL is https://stage-revalidation.tis.nhs.uk/

TISLiveDefect: 20,000 Posts Specialties MissingTIS


Joseph (Pepe) Kelly2020-04-14 20,000 Post Specialities Missing
LiveDefect: Users not able to log into TIS - Reported 07:30 AM on 16th April 20202020-04-16 Users not able to login - too many DB connections
Issue LiveDefect: Issue with Bulk Post Creation whereby NPNs are regenerated when they are updated subsequently. Andy Dingley2020-04-23 Bulk Post create - setting Auto-generate flag ON instead on Manual

TIS Self Service

Doris.Wong

Where we were at the start of the sprint

  • Deployment Process
  • Still work left on Form R Part A

Where we are now:

https://trainee.tis.nhs.uk/

Add Site Code to vwSite in the NDWYafang Deng


  • Little updates


Remove Programme and Curriculum memberships attached to LeaveManagerApprovers Programmes
Fix sync and reference services security vulnerability
Other







Priorities

  • Next Sprint
  • Overall



Post-Sprint Review survey: https://www.surveymonkey.co.uk/r/5RRM8HG