Sprint goals review with team feedback



Sprint Goal

  • Resolve the specialty bug which caused the deletion of post specialties
  • Deploy the new Reval app to a public URL for Reval Admins to browse and feedback
  • Continue the support of the extended ESR pilot


Live Issues:

Any live defects or interruptions? Any committed-to tickets were moved out as a result

Incident Logs

2020-04-16 Users not able to login - too many DB connections

2020-04-14 20,000 Post Specialities Missing

Between Sprints: 

Jira Legacy
serverSystem JIRA
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7
keyTISNEW-4217

Jira Legacy
serverSystem JIRA
columnstype,summary

,story points (effort),assignee

,created,status
maximumIssues20
jqlQueryproject = TISNEW AND issuetype in (LiveDefect, Support) AND Sprint = 334 order by created DESC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7

Incident Logs

2020-04-14 20,000 Post Specialities Missing

2020-04-16 Users not able to login - too many DB connections

2020-04-23 Bulk Post create - setting Auto-generate flag ON instead on Manual


.
:Where we were at the start of the sprint:
Where we are now:

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')


AreaSquadTeam RepresentativeDemo - from Prod URL where feasible

ESR


Continue the support of the extended ESR pilot

  • 1. Documentation / supporting the core TIS Team with the synchronisation between TIS and TIS Self Service as the solution is likely to based on similar technology that is used in the ESR
  • bi-directional solution and being used in the pilot.
  • 2. Service Stability - ensuring that some of the services that run, if there is a connection issue they automatically reconnect. 
  • 3. Message retrieval for the auditing service - If there is an issue and some investigation is required, this provides the ability to pull complete audit message records from the EsrAudit service database to support investigations
  • 4. Investigating missing app records for Milton Keynes
ESRPhil James (Unlicensed)

Review of pilot output

View file
nameTest summary.docx
height250

Revalidation:
  1. Deploy the new Reval app to a public URL for Reval Admins to browse and feedback
Reval

Where we were at the start of the sprint:

  • We did not have the public URL ready for Reval so that users could have a look and give us feedback.
  • We enhanced the summary page by adding sorting, pagination and reset trainees list features on our local machines.

Where we are now:

  • We successfully deployed a public URL for the users - demo. 
  • We enhanced the summary page by adding search and filtering features - demo.

The URL is https://stage-revalidation.tis.nhs.uk/

TISLiveDefect: 20,000 Posts Specialties MissingTIS


Joseph (Pepe) Kelly2020-04-14 20,000 Post Specialities Missing
LiveDefect: Users not able to log into TIS - Reported 07:30 AM on 16th April 20202020-04-16 Users not able to login - too many DB connections
LiveDefect:
  1. Resolve the specialty bug which caused the deletion of post specialties
TIS Issue with Bulk Post Creation whereby NPNs are regenerated when they are updated subsequently. 
Andy Dingley2020-04-23 Bulk Post create - setting Auto-generate flag ON instead on Manual

TIS Self Service

Doris.Wong

Where we were at the start of the sprint:

  • Deployment Process
  • Still work left on Form R Part A

Where we are now:

Other

Where we were at the start of the sprint:
Where we are now:https://trainee.tis.nhs.uk/

Add Site Code to vwSite in the NDWYafang Deng


  • Little updates


Remove Programme and Curriculum memberships attached to LeaveManagerApprovers Programmes
Fix sync and reference services security vulnerability
Other







Priorities

  • Next Sprint
  • Overall



Post-Sprint Review survey: https://www.surveymonkey.co.uk/r/5RRM8HG