Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Full team availability 9-day Sprint * 13 10 dev team members117 90 days

Simon

Chris

Jay

Matt

-9 days

-2 days

-1 day

-1 day

Total team absence-13 days

...

Jira Legacy
serverSystem JIRA
columnskey,summary,type,assignee,status,business value,story points (effort),priority (bv*sp)
maximumIssues100
jqlQueryproject = tisnew AND type not in (Sub-task, Epic) AND (assignee not in (benjamin.witton, Chris.Norman, Nazia.Akhtar, david.short, james.harris) OR assignee is EMPTY) AND sprint="Sprint 66" and status not in ("Not required") ORDER BY status DESC, assignee ASC, cf[11231] ASC, cf[11233] ASC, cf[11237] ASC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7

Item

TIS Ref / Owner

Status

Description of work
Link. e.g. to working software https://apps.tis.nhs.uk/
(note: use Dev for obfuscated data)
Loom video of completed work https://www.useloom.com/




Knowledge transfer:

  1. Confluence housekeeping - especially deleting documentation that is out of date. Ongoing
  2. Dev standards (Dev meeting / series of meetings). Ongoing
  3. Pairing / Mobbing
  4. Git-commit messages
  5. Walk-throughs (prep as you go - links?). 
  6. Architectural level diagrams
  1. Andy Nash (Unlicensed)


  2. All Dev team
  3. All Dev team
  4. All Dev team
  5. All Dev team
  6. All Dev team

Ongoing







Most of TISDEV has now been culled and TISNEW populated with only the relevant stuff. One or two bits still left to do.




Resource Planning:

Andy Nash (Unlicensed)


Ongoing recruitment push:

  • two new Apprentice Devs (Manchester) confirmed to be starting next Sprint (4 Feb).

Outstanding vacancies

  • London: 1*DevOps engineer, 1*FSD and 1*FED
  • Manchester: 1*Lead Dev, 1*FED and 1* Full Stack Junior Dev

...