Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Note Phase 2 evolved through iterative design, specifically to simplify the Intrepid-NDW flows.


Phase 2 is likely to be needed until all the Intrepid Modules are retired/replaced by TIS or other 3rd party solutions - currently projected to be by March 2019.


TIS - Intrepid Data Flows V1.2.pptx


Image RemovedImage Added



NDW detailed design

...