Skip to end of metadata
Go to start of metadata
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 10
Next »
Availability
(assume Team Availability Calendar is up to date, otherwise, everyone was available for 8.5 days of the 2-week Sprint)
Full team availability 8.5-day Sprint * 8 dev team members (adjusted as below) | 64 days |
---|
Andy -3, Yafang, JohnO, Simon -1, Ola, Jay, Pepe, John |
|
Total team availability this Sprint | 94% |
---|
POs present a review of Sprint goals and other committed work |
---|
Sprint Goal: Complete Placement Planning Tool MVP ready for use outside East Mids pilot and begin stabilising Reval. |
---|
Plus other committed-to work:
- Remove/Create tabs in Manage Connection have reduced visibility when displaying the record count
- Remove jHipster from Admins UI FE - removal of dependencies / libraries. Part 1
- Replace backend query param sanitizer
- Remove the Synchronisation jobs within TCS and build a separate Synchronisation service
- ESR - Produce Full Notification Files (DNF) for all Local Offices after 14/03
- Service status (Database, Admin Page, Incident Log Admin Page, Microservice)
|
POs supported by Dev team provide narrative on why, and what, emergency work was brought into the Sprint and which committed-to tickets were moved out as a result |
---|
Live Issues:
type |
summary |
story points (effort) |
assignee |
created |
status |
Dev team demo 'done' work contributing to those goals (no more reference to specific list of Jira tickets, and no more reference to work not 'done') |
---|
Item | Demo - from Prod URL where feasible | Demo link |
---|
1. | Extend logic for Programme role for Placement Planner users |
|
2. | Move revalidations' GMC outcome status updating from Revalidation to the GMC Sync |
|
3. | Remove jHipster from Admins UI FE - removal of dependencies / libraries. Part 1 |
|
4. | Replace backend query param sanitizer | Previous Site search: Loom Video Current Site search: Live Create Post page |
5. | Remove the Synchronisation jobs within TCS and build a separate Synchronisation service |
|
6. | Remove/Create tabs in Manage Connection have reduced visibility when displaying the record count |
|
| ESR - Produce Full Notification Files (DNF) for all Local Offices after 14/03 | Nothing to demo. The DNF files were produced on 18th June 2019 and included in the ESR upload on the 19th June 2019. |
8. | Service status |
|
9. |
|
|
Add Comment