Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Sprint goals review with team feedback

Sprint Goal

  • Reval Team: Rebuild the Reval Stage environment as code so it can be rebuilt on demand and a Prod environment can be built |
  • Core TIS Team: As a TIS Admin, I want to be able to record the new outcome 10 as a result of COVID. As a trainee, I can complete section 1 of form R part B
  • ESR Team: Generate (Type 1) notifications for placements

Live Issues:

Any live defects or interruptions? Any committed-to tickets were moved out as a result

type summary created status
Loading...
Refresh

Incident Logs

2020-05-04 PersonOwner job failed affecting local office filters

.

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')

SquadAreaTeam RepresentativeDemo - from Prod URL where feasible

ESR


Pilot updatePhil James (Unlicensed)
Auditing tooldavid.hay (Unlicensed)https://www.loom.com/share/acd965db75684fd4809c468dcf96d824
Monitoring queue healthJoseph (Pepe) Kelly
Service level business flow mappingPhil James (Unlicensed)
Revalidation:


TISForm R, Part B, Section 1 - Doctor DetailsBabul.Yasa (Unlicensed)
Assessments - recording an Outcome 10.1 or 10.2Andy Dingley
Unable to bulk upload rotationsAndy Dingley
PersonOwner job failed 08:27 - Users unable to see their trainees unless they remove the local office filters

Simon Meredith (Unlicensed)















Other




Priorities

Next Sprint

Objective Key Results (OKRs) Financial Q1

TIS Self Service


Revalidation


Bi-Directional Project



Redesigning TIS architecture

Objective

Part A and B


Objective

Deliver new platform and access to the recommendations app


Objective

Single directional ESR Service is adopted, Bi-directional ESR service is available in Production, and launching the new app and notifications service


Objective

Team Prepared for AWS migration in Q2

Key Results

Part A and B


Key Results

Sustainable UM system: linking new AWS based authentication to the existing KeyCloack


Key Results

Process 100% of files received from ESR successfully


Key Results

Consultation with Amazon

Data synced from TIS


Onboard Reval Admins: all Reval admins have access to the app, and are signed up into Cognito


Provide 100% of files to ESR using the new code base


Architecture Diagram developed

Pre-populated data


Penetration testing showing no critical/high issues: or any critical issues have been resolved


Minimum 90% reduction in duplicate applicant records produced


Backlog Ready – Tickets created


View and edit recommendations: Reval users are able to view all, and edit recommendations for trainees


1 deanery evaluated for bi-directional functionality


All hands sharing



Single directional ESR is used by 80% of doctors in training posts

Post-Sprint Review survey: https://www.surveymonkey.co.uk/r/5RRM8HG

  • No labels