Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »


The current list of scenarios is as follows:

  1. Create/Add site approvals
  2. Remove site approval
  3. define pathways
  4. assign pathways
  5. confirm accreditation
  6. expiry notification


These need to be validated with BMs / SMLs  (Alistair Pringle (Unlicensed))


Process Name
AP-1 Create / Add Site Approvals
Comments
DescriptionAdmins are to complete that a site is approved within the reference table to make it available for use as a site for a post/placement
ActorsSystem Admin
Pre-Conditions

Site approval notification received off platform

Site creation notification received off platform


Post-Conditions

A new & approved site is added to the Site reference table list


Process Steps
  1. Navigate to site list
  2. Select site to edit or create site
  3. Enter relevant fields
  4. Link historical sites (if applicable)
  5. Save

Site Creation

  • site name
  • site number
  • site known as
  • trust (from ref table)
  • local office (from ref table)
  • telephone number
  • address
  • post code
  • status
  • historically linked programmes
  • comments


Approvals

  • from date
  • to date
  • programme
  • site type (from ref table)
  • contact name
  • contact telephone number
  • document uploads
Alternative ProcessAP-2 Remove site approval
Rules
  • site must be approved to become available for use within a post - this is known by the approvals from / to date being valid (i.e. not expired)

JIRA Links

Audit Log


Process NameAP-2 Remove site approvalComments
DescriptionAdmins are to complete that a site is no longer approved within the reference table to make it unavailable for use as a site for a post/placement
Actors

Pre-Conditions

Post-Conditions

Process Steps
  1. Navigate to site list
  2. Select site to edit or create site
  3. Change status to inactive deactivate
  4. Link historical sites (if applicable)
  5. Save

Should anything else be done to remove approval?

Should site approval be stored historically?

Alternative Process

Rules

JIRA Links

Audit Log


Process StepsAP-3 Assign Trainer PathwaysComments
Description

Actors

Pre-Conditions

Post-Conditions

Process Steps

Alternative Process

Rules

Jira Links

Audit Log


Process StepsAP-4 Confirm AccreditationComments
Description

Actors

Pre-Conditions

Post-Conditions

Process Steps

Alternative Process

Rules

Jira Links

Audit Log


Process StepsAP-5 Expiry NotificationComments
Description

Actors

Pre-Conditions

Post-Conditions

Process Steps

Alternative Process

Rules

Jira Links

Audit Log

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.