Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Welcome

  • Overviews of the iteration

  • Any interruptions / Live Defects

  • Team going through what they’ve achieved during the iteration

  • Feedback from those on the call on what we have done (constructive criticism / praise / questions)

  • Collaboration with those on the call on what to do next

  • Ask questions:

- out loud on the call - really, we’d appreciate you doing this!;
- write in the Team meeting chat; or
- fill in the post-Review survey after the call
(for questions that occur after the call is over, or if you don’t want to ask the question during the call for whatever reason, and
for letting us know whether the Review meets your expectations, or whether you have some suggestions for improvement)

Live Issues:

key summary created updated status
Loading...
Refresh

Incident logs

2021-06-29 Trainee load balancers are internet facing

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')

Area

Description

Team Representative

Demo - from Prod URL where feasible

TISSS

Setting up an authenticator app for one-time password MFA - Usability test

Steven Howard

Demo

Reval

Manually Add/Remove Connections

Doris.Wong

Short discussion - Adding/Removing connections is reflected in connections views

TIS

Trust linked to a Site not updating the trustId linked to it

Marcello Fabbri (Unlicensed)

Site (id: 2) on TIS: Stage TIS

Site (id: 2) on Metabase: Metabase Site

Demo (update trustCode and observe trustId changing as well)

ESR

Queues optimization

Marcello Fabbri (Unlicensed)

Brief non-technical explanation


NIMDTA

Fix for LocalPostNumber field being incorrectly populated

Reuben Roberts

Post in TIS:


Post in NI (prior to the fix):


Post in NI (currently):

Webserver config consistency between HEE and NIMDTA

John Simmons (Deactivated)

Unable to demo, but worthy of note

DRAFT Objective Key Results (OKRs) 2021/22 Q2:

OKR

1st
Iteration

2nd
Iteration

3rd
Iteration

4th
Iteration

5th
Iteration

6th
Iteration

Objective: Solve MFA and complete second live pilot

Key Result#1: Run an experiment with existing pilot Trainees on using an Authenticator App. Get sufficient feedback to develop it into a solution for the next pilot.

Too early to score

Key Result#2: Coordinate at least 2 more Local Offices to run a 2nd pilot.

Too early to score

Key Result#3: Run the 2nd pilot to include live ARCP Form R completion via the app (with associated HEE admin unlocking of Form Rs submitted in error, if needed).

Too early to score

Key Result#4: Include a KR around reporting out from TIS

Too early to score

TIS Dev team roadmap:

Feedback

We really do welcome any feedback you have for us - whether it be negative or positive, or whether it be a suggestion of something we could try/incorporate in a future Review. We absolutely don’t want to stand still. We’re very happy applying the 12th Agile principle of ‘becoming more productive’ to our Reviews themselves! Your contributions to this survey are entirely anonymous, should you wish to include anything others might perceive as controversial. We welcome any and all feedback, as long as it is constructive!

  • No labels