Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 155 Current »

What is the purpose of planning?

  1. Identify goal(s) and what needs to be done and ID specific stories against the goal(s)

  2. Planning tickets to bring into Ready for Dev to work on (most of which to complete) in next iteration.

  3. Ditto above, plus check the capacity of the team in the next two weeks (availability etc)

  4. Resolve prioritisation / sequencing

  5. Assessing work in progress on the board against refreshed goals

  6. Planning is not a refinement session - this is what the Refinement session 2 days before is about

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    •  

 

Team availability (e.g., Leave & Events):

Full capacity

Non-Kanban work (this iteration):

Rob to run a session on Roadmap

Preparation to meet with Revalidation leads.

Quarterly planning-

 

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 

 

Support

Carried over…

Review sync issues in Revalidation - next step = High Level Estimation

Waiting

 

 1

Revalidation - Connections

From last iteration:

Private Beta in flight

TIS21-5152 - Getting issue details... STATUS

Private Beta waiting

 

2

Other Tech improvement

 

3

Post funding

Waiting

To be refined

 

Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = TIS21-3273 - Getting issue details... STATUS - we queried the scope around delivery plan. Further conversation to fletch some things. Based on discussion around what our actual focus is.

4

Programme Membership

In flight

 

5

TIS assessment

 

6

ESR

17

Data work

From last iteration:

11

Retro actions

 

 

LTFT discovery

Cross-team effort, involving Ade B and Ade A .

TIS21-5118 - Getting issue details... STATUS Discuss moving time for Y&H as it clashes with the Admin Review

Ade Babalola: LTFT Discovery Plan.xlsx

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

 

Team availability (e.g., Leave & Events):

Stan A/L 25th- 31st Oct

Jay 2nd-8th of November

Non-Kanban work (this iteration):

Rob to run a session on Roadmap

Preparation to meet with Revalidation leads.

Quarterly planning-

Work lined up for the iteration

0

Live Defect

From last iteration: TIS21-5261 - Getting issue details... STATUS : Cai to arrange huddle this afternoon or tomo

Support

Carried over…

Review sync issues in Revalidation - next step = High Level Estimation

Waiting

 1

Revalidation - Connections

From last iteration:

Private Beta in flight

TIS21-5152 - Getting issue details... STATUS

Private Beta waiting

2

Other Tech improvement

3

Post funding

Waiting

To be refined

Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = TIS21-3273 - Getting issue details... STATUS - we queried the scope around delivery plan. Further conversation to fletch some things. Based on discussion around what our actual focus is.

4

Programme Membership

In flight

5

TIS assessment

6

ESR

TIS21-4985 - Getting issue details... STATUS

If there is capacity/willingness to refine: TIS21-4985 - Getting issue details... STATUS

17

Data work

From last iteration:

TIS21-4620 - Getting issue details... STATUS Further team discussion when Stan returns from A/L

11

Retro actions

LTFT discovery

Cross-team effort, involving Ade B and Ade A .

TIS21-5118 - Getting issue details... STATUS Discuss moving time for Y&H as it clashes with the Admin Review

Ade Babalola: LTFT Discovery Plan.xlsx

 

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights) - will we get the two outstanding tickets completed? Review where we are and work out next step.

 

Team availability (e.g., Leave & Events):

  • Pepe (A/L) 13th-15th Sept

  • Yafang (A/L) 15th-22nd of Sept

  • Cai (A/L) 18th-22nd of Sept

 

Non-Kanban work (this iteration):

Arrange a call with Revalidation leads ( Connections) to ascertain MVP IF WE FEEL that the F1 ticket and sync work will be advanced in this Iteration.

TBD: TIS21-4876 - Getting issue details... STATUS HLE session held.

 

Work lined up for the iteration

0

Live Defect

From last iteration:

Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24

TIS21-4689 - Getting issue details... STATUS

Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? TIS21-4864 - Getting issue details... STATUS -(AdHoc)

 1

Connections MVP dependent

In for development

Review sync issues in Revalidation TIS21-4956 - Getting issue details... STATUS High priority as part of the MVP- with time box for 2 days. To further liaise with Pepe when back.
Can we do this and see what tickets are generated as these will need to be assessed in the context of the MVP for Connections.

2

Revalidation - Connections

Private Beta in flight

TIS21-4154 - Getting issue details... STATUS Dev plan to finish this ticket in the next one /two days ready to be presented at Review.

TIS21-4690 - Getting issue details... STATUS

Private Beta feedback

Need to extend the access to the Private Beta, so looking to Ade B to continue a dialogue and to understand likely posy MVP developments and issues.

3

Revalidation designated body merger

I (Rob) needs to develop a ticket for this work. Tow London designated bodies are to become one. Depending on the size of this work (refinement) will determine when it is to be done, so starting this off will be something ASAP.
Placeholder - TIS21-5060 - Getting issue details... STATUS

4

Other Tech improvement

In flight - does this involve us?
TIS21-1209 - Getting issue details... STATUS

In for development - does these involve us? Is it a Pepe one?
TIS21-3162 - Getting issue details... STATUS

TIS21-4689 - Getting issue details... STATUS

5

Changes to email

Specifically I would like to understand how to update all staff emails to NHS.NET (1) on Keycloak and (2) the Reval users who are different? It would be very helpful to get this understood so we can make sure resources are in place to support the change. We now have a spreadsheet from IT with “old” and “new” so we can map the chnges.
TIS21-5061 - Getting issue details... STATUS

6

Post funding

TIS21-95 - Getting issue details... STATUS

Next

TIS21-4875 - Getting issue details... STATUS

Would like to progress refining these tickets as they will be the next in line post MVP.

7

Programme Membership

In flight

TIS21-3785 - Getting issue details... STATUS
What is next to keep this work progressing?

8

BUGS

TIS21-4958 - Getting issue details... STATUS Potential ticket to come in to the iteration- impact audit of GMC end of October/November so would be important to get this work submitted.

TIS21-5007 - Getting issue details... STATUS

9

ESR

In flight
TIS21-213 - Getting issue details... STATUS (Tech Improvement) Ongoing work

Lining up --- TIS21-4985 - Getting issue details... STATUS

10

Data work

In flight

TIS21-4838 - Getting issue details... STATUS

TIS21-5019 - Getting issue details... STATUS

TIS21-4620 - Getting issue details... STATUS -AdHoc Huddle

 

11

Retro actions

TIS21-4988 - Getting issue details... STATUS

TIS21-4955 - Getting issue details... STATUS

12 

LTFT discovery

LTFT Discovery Plan.xlsx

 

 

13

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights) - will we get the two outstanding tickets completed? Review where we are and work out next step.

 

Team availability (e.g., Leave & Events):

  • Pepe (A/L) 31st of Aug- 15th of September

  • Yafang (A/L) 1st September

Non-Kanban work (this iteration):

Arrange a call with Revalidation leads ( Connections) to ascertain MVP

TBD: TIS21-4876 - Getting issue details... STATUS HLE session held. Rob has an upcoming call with Stephen Loughran to get an email list if possible. (outcome to help support with GMC’s email query)

Work lined up for the iteration

0

Live Defect

From last iteration:

Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24

TIS21-4689 - Getting issue details... STATUS

Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? TIS21-4864 - Getting issue details... STATUS -(AdHoc)

Support

Carried over…

Review sync issues in Revalidation - next step = High Level Estimation

TIS21-4956 - Getting issue details... STATUS

Waiting

 1

Revalidation - Connections

From last iteration:

Private Beta in flight

TIS21-4154 - Getting issue details... STATUS

Private Beta waiting

TIS21-4690 - Getting issue details... STATUS

Private Beta feedback

?Potential Bug ticket to be raised but further looking at is required.- Cai to email GMC Data

Apart from the above two tickets, is there anything else outstanding? What about the observation that the system is slow?- Investigation ticket to be raised if we don’t already have one( To be created after this planning session). AdHoc refinement.

2

Other Tech improvement

Liaise with Andy Dingley re: https://hee-tis.atlassian.net/browse/TIS21-1209

3

Post funding

Waiting

TIS21-95 - Getting issue details... STATUS

To be refined

TIS21-4875 - Getting issue details... STATUS

Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = TIS21-3273 - Getting issue details... STATUS - we queried the scope around delivery plan. Further conversation to fletch some things. Based on discussion around what our actual focus is.

4

Programme Membership

In flight

TIS21-3785 - Getting issue details... STATUS

5

TIS assessment

TIS21-4958 - Getting issue details... STATUS

6

ESR

TIS21-213 - Getting issue details... STATUS (Tech Improvement)

If there is capacity/willingness to refine: TIS21-4985 - Getting issue details... STATUS

17

Data work

From last iteration:

TIS21-4838 - Getting issue details... STATUS

TIS21-4620 - Getting issue details... STATUS -AdHoc Huddle

TIS21-4612 - Getting issue details... STATUS

11

Retro actions

TIS21-4988 - Getting issue details... STATUS

TIS21-4955 - Getting issue details... STATUS

LTFT discovery

Watching brief. Cross-team effort, involving Ade B in the first instance.

What stage are we in now? research stage(ongoing)

-Sending out invites for interviews

TIS21-4417 - Getting issue details... STATUS

Ade Babalola: LTFT Discovery Plan.xlsx

 

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights) - will we get the two outstanding tickets completed? Review where we are and work out next step.

 

Team availability (e.g., Leave & Events):

  •  Steve (A/L) 16th to 18th of August

  • Jay (A/L) 24th and 25th of August

  • Cai (A/L) 21st of August

Bank Holiday: 28th of August

Non-Kanban work (this iteration):

Arrange a call with Revalidation leads ( Connections) to ascertain MVP

Work lined up for the iteration

0

Live Defect

From last iteration:

Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24

TIS21-4687 - Getting issue details... STATUS (AdHoc)

TIS21-4689 - Getting issue details... STATUS

Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? TIS21-4864 - Getting issue details... STATUS -(AdHoc)

Support

Carried over…

Review sync issues in Revalidation - next step = High Level Estimation

TIS21-4956 - Getting issue details... STATUS

Waiting

TIS21-4952 - Getting issue details... STATUS

TIS21-4928 - Getting issue details... STATUS (linked to MVP)

 1

Revalidation - Connections

From last iteration:

Private Beta in flight

TIS21-4154 - Getting issue details... STATUS

Private Beta waiting

TIS21-4690 - Getting issue details... STATUS

Private Beta feedback

Apart from the above two tickets, is there anything else outstanding? What about the observation that the system is slow?-

2

Other Tech improvement

TIS21-4954 - Getting issue details... STATUS (preventative) AdHoc

Continuing:

TIS21-4862 - Getting issue details... STATUS (Cross-team)

3

Post funding

Waiting

TIS21-95 - Getting issue details... STATUS

To be refined

TIS21-4875 - Getting issue details... STATUS

Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = TIS21-3273 - Getting issue details... STATUS - we queried the scope around delivery plan. Further conversation to fletch some things.

4

Programme Membership

In flight

TIS21-3785 - Getting issue details... STATUS

TIS Assessment

TIS21-4958 - Getting issue details... STATUS

 5

Email Change

TIS21-4876 - Getting issue details... STATUS
HLE session held

Can we have a session please to work out what next? Rob has an upcoming call with Stephen Loughran to get an email list if possible.

6

ESR

TIS21-213 - Getting issue details... STATUS (Tech Improvement)

TIS21-4775 - Getting issue details... STATUS Blocked! There’s a blocker with built server - Raising ?a ticket??? cross-team???Not clear on the blocker-outside this planning.

17

Data work

From last iteration:

TIS21-4838 - Getting issue details... STATUS

TIS21-4612 - Getting issue details... STATUS

11

Retro actions

TIS21-4955 - Getting issue details... STATUS

LTFT discovery

Watching brief. Cross-team effort, involving Ade B in the first instance.

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights) - will we get the two outstanding tickets completed?

 

Team availability (e.g., Leave & Events):

 

  • Pepe ~1-2 days TBA

  • James (A/L) 4th-11th

  • Steve (A/L) 7th-18th

  • Team catch up in LONDON 10.08.23

  • Rob AL 3/4 August

 

Non-Kanban work (this iteration):

Work lined up for the iteration

0

Live Defect

Linked to - https://hee-tis.atlassian.net/l/cp/KC01PH24

TIS21-4687 - Getting issue details... STATUS

TIS21-4689 - Getting issue details... STATUS


Linked to - https://hee-tis.atlassian.net/l/cp/4kLjYF8T status? TIS21-4864 - Getting issue details... STATUS -

Support

Helpful to understand and get a position on the perception that Recommendations is unstable. Suggestions on how to move this forward? Rob to raise a ticket? Spike, High level estimation to discuss around it.


https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/Shared%20Documents/Admin%20Product%20Team/Revalidation/General%20information/Revalidation%20sync%20issues.xlsx?d=w4fc720a27fa54f30a46409eccbb677bf&csf=1&web=1&e=6YlOWY

 1

Revalidation - Connections

From last iteration:

Private Beta in flight

TIS21-4154 - Getting issue details... STATUS Huddle to help progress this ticket ? Today

Private Beta waiting

TIS21-4690 - Getting issue details... STATUS

Private Beta feedback

Feedback from TeamsConnections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net) >> Can we just give this a quick review, including updating recent feedback if applicable. Question >>> Are the above two tickets what has been ID’ed for the Private Beta?
@Ade B - can you establish opinion from the Reval Leads on next steps.

2

Connections user research

Carried over from last Planning → Do we need to tidy up the revalidation material on Confluence? ?Team discussion and suggestion re: Reval materials on confluence? Rob started informally logging this and will share when advanced if that’s of interest?

3

Other Tech improvement

New:

TIS21-4862 - Getting issue details... STATUS (Cross-team)

Continuing:

TIS21-4739 - Getting issue details... STATUS

Post funding

From last iteration:

In flight

TIS21-4802 - Getting issue details... STATUS

Waiting

TIS21-95 - Getting issue details... STATUS

To be refined

TIS21-4875 - Getting issue details... STATUS ADHOC refinement ?today/tomorrow

Can we look at getting a delivery plan set up so this work can be prioritised and sequenced alongside rolling user feedback. Epic = TIS21-3273 - Getting issue details... STATUS

4

Programme Membership

Waiting

TIS21-3785 - Getting issue details... STATUS are we intending to bring this in? It is refined and of medium effort.

? → There’s an improvement that Joseph (Pepe) Kelly looked into about changing the way Conditions Of Joining (acceptance) are mapped - TIS21-4759 - Getting issue details... STATUS 3 Amigo in this iteration. Not intending to do this work in this Iteration but it will be good to have it refined.

 

Email Change

 Contended for High Level Estimation and to add related stories so these can be prioritised and developed for future work --- TIS21-4876 - Getting issue details... STATUS Friday HLE to scope out this work. P1

6

ESR

  • MongoDB contract renewal for ESR: We need a ticket. TIS21-4884 - Getting issue details... STATUS

TIS21-213 - Getting issue details... STATUS (Tech Improvement)

TIS21-4775 - Getting issue details... STATUS

17

Data work

From last iteration:

TIS21-4838 - Getting issue details... STATUS

TIS21-4612 - Getting issue details... STATUS

TIS21-4688 - Getting issue details... STATUS

TIS21-4620 - Getting issue details... STATUS - To be 3 Amigo’d on the completion of the 4838

11

Retro actions

From last iteration:

TIS21-4781 - Getting issue details... STATUS

TIS21-4882 - Getting issue details... STATUS

TIS21-4883 - Getting issue details... STATUS

LTFT discovery

cross-team effort, involving Ade B in the first instance. ? Need for team update regarding this work.

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights).

 

Team availability (e.g., Leave & Events):

 

  • Pepe on A/L 19.7.23 @14:00 to 21.7.23

  • Jay on A/L 20/7-21/7

  • Cai, Stan on 24/7

  • Steve 20/7

 

Non-Kanban work (this iteration):

Work lined up for the iteration

0

Live Defect

TIS21-4687 - Getting issue details... STATUS

TIS21-4689 - Getting issue details... STATUS

Live Defect: 19.7.23 ticket to be created.

 1

Revalidation - Connections

In flight

 

 MVP improvements ready

TIS21-4690 - Getting issue details... STATUS

 MVP improvements from feedback

Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net)

Assume 4548 makes this ticket unnecessary for the time being?

#8 > Bring in TIS21-4154 - Getting issue details... STATUS Now that the spike has been completed can this ticket be revise, refined and put in.

2

Connections user research

Proactively seek additional feedback. from users on the UR channel, UR to continue to ensure users are engaging with regular updates on Teams.
Olasimbo Babalola → can we do an update after planning on work we are looking at, to keep engagement.

Carried over from last Planning → Do we need to tidy up the revalidation material on Confluence? ?Team discussion and suggestion re: Reval materials on confluence? Rob started informally logging this and will share when advanced if that’s of interest?

3

Other Tech improvement

TIS21-4739 - Getting issue details... STATUS

Post funding

TIS21-4802 - Getting issue details... STATUS

TIS21-95 - Getting issue details... STATUS get refined and lined-up (ADHoc? Today or tomorrow)

TIS21-4805 - Getting issue details... STATUS for investigation

Can we create a UR channel and add the Leads and other participants so we can get QA as appropriate? Rob happy to set this up to follow previous precedent.

Lunch and learn to be arranged: Catherine to put in team’s calendar

4

Programme Membership

TIS21-3785 - Getting issue details... STATUS are we intending to bring this in? It is refined and of medium effort.

There’s an improvement that Joseph (Pepe) Kelly looked into about changing the way Conditions Of Joining (acceptance) are mapped - was this done? TIS21-4759 - Getting issue details... STATUS 3 Amigo in this iteration.

 

Email Change

 ? Spike for an investigation: How do we update TIS admin and revalidation email to the current NHS.NET email: Get a call with the team: Catherine to arrange.

6

ESR

Prevent irreparable loss of the ESR interface due to MongoDB Atlas contract not being in place from 1st Aug. Rob supporting with this query

TIS21-213 - Getting issue details... STATUS (Tech Improvement) conversation on how we achieve the goal of this ticket- we have a blocker: internal blocker - ensure token has the necessary access Do we have a blocker with this ticket due to its length of stay? Do we need extra pair of hands to help move this ticket on?

17

Data work

TIS21-4612 - Getting issue details... STATUS

TIS21-4688 - Getting issue details... STATUS

11

Retro actions

TIS21-4781 - Getting issue details... STATUS

TIS21-4828 - Getting issue details... STATUS

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

 

 

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights).

    • Develop a delivery plan for the final push to get Connections in a state for adoption - current changes based on the UR. What stories do we have?

    • Demonstrate the MVP is being refined and improved.

 

Team availability (e.g., Leave & Events):

 

  • Stan (A/L) 5th - 7th of July

  • Pepe (A/L) 6th July + probably 11th/12th July

 

Non-Kanban work (this iteration):

  1. Pen Test planning in light of Connections release? Not required.

  2. Rob / Catherine to check up on preferences for London DB merger and support for bulk upload re connections with GMC.

Work lined up for the iteration

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

TIS21-4687 - Getting issue details... STATUS

TIS21-4689 - Getting issue details... STATUS

 1

Revalidation - Connections

In flight

TIS21-4548 - Getting issue details... STATUS

MVP improvements ready

TIS21-4574 - Getting issue details... STATUS

 

MVP improvements from feedback

Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net)

#13 > TIS21-4662 - Getting issue details... STATUS (this is a fault/bug)(P1)

#6 > Send to GMC comes up as “Save”, but should be “Submit” so it’s clear what's happening? Create new ticket and to be 3 Amigo with Steve ?today

#7 > Bring in TIS21-4526 - Getting issue details... STATUS – To create a new ticket for a specific filter which is addressing programme owner(P2)

#9 > Dummy record removal TIS21-4690 - Getting issue details... STATUS

#8 > Bring in TIS21-4154 - Getting issue details... STATUS Creating of Spike ticket

EDIT 14/07 to add that 4154 spike ticket = TIS21-4769 - Getting issue details... STATUS

MVP outstanding --- these have gone back to the backlog. Are they necessary for MVP?

TIS21-4040 - Getting issue details... STATUS

TIS21-4039 - Getting issue details... STATUS

Aim to get two above tickets refined this Iteration?

 *** can we go through the five Epics and ID any tickets not done and work out whether the still have legs?  Mini backlog refinement of MVP related. Catherine and Rob to take time and go through this.

2

Connections user research

Proactively seek additional feedback. from users on the UR channel, UR to continue to ensure users are engaging with regular updates and emails

Do we need to tidy up the revalidation material on Confluence? ?Team discussion and suggestion re: Reval materials on confluence

3

Other Tech improvement

Generate stories from MongoDB: Joseph (Pepe) Kelly to create tickets out of this.

  • cost optimisation

  • database design

  • a major version upgrade

4

Programme Membership

TIS21-2403 - Getting issue details... STATUS

TIS21-3785 - Getting issue details... STATUS

There’s an improvement that Joseph (Pepe) Kelly looked into about changing the way Conditions Of Joining (acceptance) are mapped

 

Bulk uploads

TIS21-4651 - Getting issue details... STATUS

TIS21-4508 - Getting issue details... STATUS

5

Post funding UR

Can we get some priority tickets developed so they can be lined up, please? Catherine, James, Ade B and Ade A, Rob etc. Arrange an hour conversation to work out priority tickets.

6

ESR

TIS21-213 - Getting issue details... STATUS (Tech Improvement) conversation on how we achieve the goal of this ticket- we have a blocker: internal blocker - ensure token has the necessary access

17

Data work

TIS21-4612 - Getting issue details... STATUS

TIS21-4688 - Getting issue details... STATUS

TIS21-4607 - Getting issue details... STATUS

11

Retro actions

  TIS21-4751 - Getting issue details... STATUS

Plus to be added from yesterday’s session.

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

 

 

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections

    • Continue with the private beta and proactively seek user feedback from all Leads and team (who may have own ideas and insights).

    • Socialise user feedback insights to team so that we can make judgements on improvements - which may need to be validated with users.

    • Identified MVP improvements prioritised on the fly.

    • Demonstrate the MVP is being refined and improved.

 

Team availability (e.g., Leave & Events):

  • Cai (A/L) 26th- 30th of June

  • Steve (A/L) 23rd of June

  • Pepe (A/L) 26th -29th of June (TBC)

  • James H (A/L)29th-3rd of July

  • Rob (A/L) prob 26-27 June (TBC)

Non-Kanban work (this iteration):

  1. ESR meeting TBA (Rob leading on this)

  2. GMC meeting - cover-off London DB merger, the stage update and support for bulk connections.

  3. Pen Test planning in light of Connections release?

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

TIS21-4687 - Getting issue details... STATUS

TIS21-4689 - Getting issue details... STATUS

 1

Revalidation - Connections

In flight

TIS21-4548 - Getting issue details... STATUS Cai and Yafang meeting after planning.

MVP improvements ready

TIS21-4574 - Getting issue details... STATUS

MVP outstanding (when are these necessary to be done)?

TIS21-4040 - Getting issue details... STATUS

TIS21-4039 - Getting issue details... STATUS

MVP improvements from feedback

Feedback from Teams → Connections Private Beta - TIS21 Confluence Space - Confluence (atlassian.net)

#6 > Send to GMC comes up as “Save”, but should be “Submit” so it’s clear what's happening?

#9 > Dummy record removal TIS21-4690 - Getting issue details... STATUS

#7 > Bring in TIS21-4526 - Getting issue details... STATUS – ? Is this dependent on further insights?

#8 > Bring in TIS21-4154 - Getting issue details... STATUS Would need to be refined.

#13 > TIS21-4662 - Getting issue details... STATUS (ADHOC refinement as a matter of urgency?)

2

Connections user research

Get outputs from the UR sessions analysed and socialised so we can confirm suggested improvements and join up with Teams feedback.

User journey outputs? Dependency on insights then to plan team feedback session.

3

Tech improvement

Generate stories from MongoDB: Joseph (Pepe) Kelly suggesting to create tickets out of this? And this aim to come in in this Iteration?

  • cost optimisation

  • database design

  • a major version upgrade

Book second day

4

Programme Membership

TIS21-2403 - Getting issue details... STATUS

TIS21-2399 - Getting issue details... STATUS (should be mostly Reviews)

Bulk uploads

James would like us to consider these… They are dependent on 2403 (I think). Opinions?

TIS21-4651 - Getting issue details... STATUS → is this a bug?

TIS21-4508 - Getting issue details... STATUS

Are we in a position to bring these in? At least to get them refined so they can be lined up.
TIS21-3822 - Getting issue details... STATUS
TIS21-3819 - Getting issue details... STATUS
TIS21-3785 - Getting issue details... STATUS (Tickets to be put in refinement)

5

Post funding UR

Can we get some priority tickets developed so they can be lined up, please?

6

ESR

TIS21-213 - Getting issue details... STATUS (Tech Improvement) conversation on how we achieve the goal of this ticket- we have a blocker: internal blocker - ensure token has the necessary access

KSS ESR issue(s) to be investigated.

17

Data work

TIS21-4612 - Getting issue details... STATUS Dependency on 4688

TIS21-4688 - Getting issue details... STATUS

TIS21-4607 - Getting issue details... STATUS

11

Retro actions

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

 

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections - Go live with three teams ( Wessex, Nwest, London &KSS)as part and cycle round the UR so we can judge immediate improvements.

 

Team availability (e.g., Leave & Events):

  • James Harris (A/L) 6th to the 9th of June

  • Pepe (A/L): Wed 7th (Today) pm

  • Jay (A/L) half day on Friday 9th June

  • ? Rob (A/L) next week (TBC)

Non-Kanban work (this iteration):

  1. ESR meeting TBA (Rob leading on this)

Work lined up for the iteration

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 

 1

Revalidation - Connections

This Iteration:

TIS21-4548 - Getting issue details... STATUS

Bring in TIS21-4526 - Getting issue details... STATUS – this needs to be refined. It will address a shortfall in usability of the Discrepancy list by having a default filtering by DB. It will also introduce filtering from which we can iterate based on feedback.

Need to review the user research and cycle round any improvements ASAP. These may occur in these two weeks.

>>> Carry on with logic tickets. Do we need to review and clear tickets no longer required etc. (3 Amigos) on the logic tickets this iteration.

>>> Get three teams on production, which should happen today.

2

Connections user research

We need an epic created for this work, so that we can capture and ticket-up things that we agree need to be done either as part of immediate improvement, or for later prioritisation.

Capturing UR work / integrating it into JIRA.

Ade B:

Stage environment

Is there anything we need to do on Stage to synchronise with the GMC update of their Test system?

Would need planning and refinement re: GMC update of stage environment.

TIS

Monitoring and Logging ticket - add Sentry to TCS (& Reference). TIS21-4560 - Getting issue details... STATUS

3

Tech improvement

MongoDB:

Updating docs & planning with external expertise to do a subset of:

  • cost optimisation

  • database design

  • a major version upgrade

4

Programme Membership

TIS21-2403 - Getting issue details... STATUS

TIS21-2399 - Getting issue details... STATUS (should be mostly Reviews)

Bulk uploads

James would like us to consider these… They are dependent on 2403 (I think). Opinions?
TIS21-3822 - Getting issue details... STATUS
TIS21-3819 - Getting issue details... STATUS
TIS21-3785 - Getting issue details... STATUS (Tickets to be put in refinement)

5

Post funding UR

When James is back it would be very helpful to start to develop and refine the related user stories, with their priority.

6

ESR

TIS21-213 - Getting issue details... STATUS (Tech Improvement) conversation on how we achieve the goal of this ticket- no current blocker

17

Data work

TIS21-4567 - Getting issue details... STATUS

TIS21-4457 - Getting issue details... STATUS

TIS21-4612 - Getting issue details... STATUS

TIS21-4607 - Getting issue details... STATUS

11

Retro actions

TIS21-4625 - Getting issue details... STATUS Links in with (2)Connections user research

  TIS21-4626 - Getting issue details... STATUS

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections - getting towards Live + starting UR

 

Team availability (e.g., Leave & Events):

  • Ade A (A/L) 25/5/23

  • James Harris (A/L) 6/6/23

  • Rob (A/L) Fri 26 and Tues 30th

Bank Holiday: 29th of May 2023

Non-Kanban work (this iteration):

Discussions: Reval Leads-connection update

Speaking with Wales about what TIS does. Wales are considering alternatives to Intrepid (which was used by HEE & NI before moving to TIS)- Planning to meet again 1st of June

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 1

Revalidation - Connections

This Iteration:

TIS21-4555 - Getting issue details... STATUS

TIS21-4554 - Getting issue details... STATUS

TIS21-4548 - Getting issue details... STATUS

>>>  Carry on with logic tickets. Do we need to review and clear tickets no longer required etc. (3 Amigos) on the logic tickets this iteration.

>>> Have we picked up any other immediate priorities that we need to resolve this iteration?- Clarifying on discrepancies list(for further discussion)

>>> Need to get all Leads on Stage

>>> Prep for one/two teams as early adopters.

2

Connections user research

Can we create an Epic to frame this work? Covers user research and the any improvements that come out of this? This will help with vis
Ade B:

3

Tech improvement

TIS21-4361 - Getting issue details... STATUS

4

Programme Membership

TIS21-2403 - Getting issue details... STATUS

TIS21-2399 - Getting issue details... STATUS (should be mostly Reviews)

5

Post funding UR

Session with team on Post Funding (retro action)

Going through needs based on categorisation

Work to start to develop user stories within the Epic. Ade B, James, Catherine and Rob etc( to be considered for next iteration)

6

ESR

TIS21-213 - Getting issue details... STATUS (Tech Improvement) conversation on how we achieve the goal of this ticket- no current blocker

17

Data work

TIS21-4567 - Getting issue details... STATUS

TIS21-4457 - Getting issue details... STATUS

11

Retro actions

TIS21-4453 - Getting issue details... STATUS ? to be discussed with team then( To link this with Stan’s planned work around our Jira dashboard)

TIS21-4570 - Getting issue details... STATUS : Ade B to guide on this on post funding.

12

Roadmap review

TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap (does the team want to start to explore this)?

.

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections - What value can we deliver?

  • UR - Post funding Research Plan and user needs to start.

 

Team availability (e.g., Leave & Events):

  • Yafang15th -19th of May

Bank Holiday: 29th of May 2023

Non-Kanban work (this iteration):

  1. Review survey results. Can we get a call in with Team?

Discussions: Need to get a call in with the team to move work on user management with Ade B and Catherine_ to confirm a date?

Speaking with Wales about what TIS does. Wales are considering alternatives to Intrepid (which was used by HEE & NI before moving to TIS)-

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 1

Revalidation - Connections

This Iteration:

TIS21-3734 - Getting issue details... STATUS

TIS21-4157 - Getting issue details... STATUS

TIS21-4510 - Getting issue details... STATUS

TIS21-4510 - Getting issue details... STATUS

TIS21-4526 - Getting issue details... STATUS -Epic? Is this post MVP improvement work led by the UR and prob FE too.

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

 

3

TIS (Infrastructure)

4

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. liaising with Trainee team re-moving this tickets forward

Clause: currently not refined-

Cross team refinement

For Yafang and Pepe + trainee team

COJ- trainee team are currently working along side tickets in questioned

? Trainee team need to unblock work to prioritise in order to allow Admin to move work on- Encourage trainee team to bring ? tickets into their own iteration~

7

Technical improvement

9

Post funding UR

User mapping has been done and will be shared with the Team.

Joint working with Data analyst to review feedback of our users

Research plan also to do: to be completed upon Alpha phase

Focus work on this iteration : Post funding, reviewing phase of user feed back

10

Retro actions

TIS21-4453 - Getting issue details... STATUS

  TIS21-4529 - Getting issue details... STATUS

11

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

https://healtheducationengland.sharepoint.com/:x:/r/sites/TISys/_layouts/15/Doc.aspx?sourcedoc=%7B957EBA4D-DEBB-4759-8F3B-7088E94B4519%7D&file=Connection%20iteration.xlsx&action=default&mobileredirect=true&DefaultItemOpen=1&login_hint=Catherine.Odukale%40hee.nhs.uk&ct=1683705063535&wdOrigin=OFFICECOM-WEB.START.EDGEWORTH&cid=ac8ac64f-f6af-4c96-90d1-16e09d23d0b9&wdPreviousSessionSrc=HarmonyWeb&wdPreviousSession=62cd44b3-80ab-49b4-ad29-a21c9e003360

Explode-out revalidation to produce a Revalidation Roadmap

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections - What value can we deliver?

  • UR - Post funding Research Plan and user needs to start.

 

Team availability (e.g., Leave & Events):

  • Stan (A/L) 25-28th April

  • ? Rob (A/L) 5th May

Bank Holiday: 1st of May and 8th of May

Non-Kanban work (this iteration):

  1. Review survey results. Can we get a call in with Team?

Discussions: Need to get a call in with the team to move work on user management 27/4/23 with Ade B and Catherine

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 1

Revalidation - Connections

This Iteration:

TIS21-3961 - Getting issue details... STATUS

TIS21-3962 - Getting issue details... STATUS

TIS21-3963 - Getting issue details... STATUS

TIS21-4038 - Getting issue details... STATUS

TIS21-3772 - Getting issue details... STATUS

 

3

TIS (Infrastructure)

TIS21-4354 - Getting issue details... STATUS Ongoing work with Pepe

4

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 & TIS21-2403. liaising with Trainee team re-moving this tickets forward

Clause: currently not refined-

Cross team refinement

For Yafang and Pepe + trainee team

 

7

Technical improvement

High-Level plan & refinement for ESR on ECS work… (Jayanta Saha) TIS21-213 - Getting issue details... STATUS

There is some additional Tech Improvement that doesn’t directly involve services for the Connections MVP similar to TIS21-3874 - Getting issue details... STATUS Tech team sharing

9

Post funding UR

User mapping has been done and will be shared with the Team. Research plan also to do.

Focus work on this iteration : Post funding, gathering user feedback~

10

Retro actions

 

11

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

 

Goal(s) for the next Iteration:

Statement:

Focusing on

  • Team - Revalidation connections - What value can we deliver?

  • UR - Post funding Research Plan and user needs to start.

 

Team availability (e.g., Leave & Events):

  • Stan(Paternity) 12-18th April

  • Stan (A/L) 19th-25th April

  • Cai (A/L) 12th- 14th of April

  • Steve (A/L) 13th-14th of April

Bank Holiday:

Non-Kanban work (this iteration):

  1. Review survey results. Can we get a call in with Team?

Discussions: Need to get a call in with the team to move work on user management

Work lined up for the iteration

0

Live Defect

TIS21-4367 - Getting issue details... STATUS … Just RCA & Actions left?

 1

Revalidation - Connections

This Iteration:

TIS21-3961 - Getting issue details... STATUS

TIS21-3962 - Getting issue details... STATUS

TIS21-3963 - Getting issue details... STATUS

TIS21-3874 - Getting issue details... STATUS

Last Iteration:

TIS21-3774 - Getting issue details... STATUS - next work in line (for refinement)

Team meeting to go through Logic tickets and ? re-prioritise as needed and we should put additional tickets into the Ready for Development pile so they can be taken in as required. Currently there is only one ticket

3

TIS (Infrastructure)

TIS21-4354 - Getting issue details... STATUS Ongoing work with Pepe and the team

4

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 &TIS21-2403. liaising with Trainee team re-moving this tickets forward

Clause: currently not refined-

For Admin team to liaise with trainee team re: tickets

7

Technical improvement

High-Level plan & refinement for ESR on ECS work… (Jayanta Saha) TIS21-213 - Getting issue details... STATUS

TIS21-3874 - Getting issue details... STATUS

Not refined but need to do (sorry from Joseph (Pepe) Kelly ): TIS21-4370 - Getting issue details... STATUS

9

Post funding UR

User mapping has been done and will be shared with the Team. Research plan also to do.

Start the research: Ongoing work

10

Retro actions

TIS21-4368 - Getting issue details... STATUS

TIS21-4369 - Getting issue details... STATUS

TIS21-4319 - Getting issue details... STATUS this work to be linked with Stan’s Jira Dashboard

 

11

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

https://app.featuremap.co/m/mahTIp/mvp-definitive-list-of-doctors-currently-connected-to-a-db-as-mirrored-on-gmc-connect-and-the-ab

 

 

Goal(s) for the next Iteration:

Statement:

Focussing on

  • Developers - Designated Body changes - Can we be clear what we doing before 27th to test and investigate and what we are doing after 27th to implement. This may include a tail for further work after the codes have been changed.

  • Developers - Revalidation connections - What value can we deliver?

  • Team - To produce a delivery plan for the Connections work.

  • UR - Resolve what the Revalidation Alpha reporting objectives are?

  • UR - Post funding Research Plan and user needs to start.

Team availability (e.g., Leave & Events):

  • Stan(Paternity) 3rd-18th April

  • Jay (A/L) 13th –31st March

  • Pepe 4th April TBC

  • Ade A (A/L) 27th – 31st March

  • Rob 30th and 31st of March

  • Easter holiday- 7th and 10th April

Non-Kanban work (this iteration):

  1. Review survey results. Can we get a call in with Team?

Work lined up for the iteration

Work lined up for the iteration

 1

Revalidation - Connections

TIS21-3774 - Getting issue details... STATUS - next work in line (for

refinement)

TIS21-3874 - Getting issue details... STATUS

Devs Team meeting to go through Logic tickets and ? re-prioritise as needed

2

Merger

Release Plan for NHS E Restructure GMC Changes

Revalidation Connections - Overview

Summary of work done and work to do - formation of a delivery plan
https://hee-tis.atlassian.net/l/cp/zd0imJxs

3

Certification

TIS21-4320 - Getting issue details... STATUS

4

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 &TIS21-2403.

?

5

Bulk Upload

TIS21-3949 - Getting issue details... STATUS

6

Data work

7

Technical improvement

8

Revalidation reporting research / discovery

In progress → UR -

Resolve Alpha approach

9

Post funding UR

Research plan and user mapping

Start the research: Ongoing work

10

Retro actions

TIS21-4318 - Getting issue details... STATUS

TIS21-4319 - Getting issue details... STATUS

 

11

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

https://app.featuremap.co/m/mahTIp/mvp-definitive-list-of-doctors-currently-connected-to-a-db-as-mirrored-on-gmc-connect-and-the-ab

Goal(s) for the next Iteration:

Statement:

Focussing on

  • Developers - Designated Body changes - Can we be clear what we doing before 27th to test and investigate and what we are doing after 27th to implement. This may include a tail for further work after the codes have been changed.

  • Developers - Revalidation connections - What value can we deliver?

  • Team - To produce a delivery plan for the Connections work.

  • UR - Resolve what the Revalidation Alpha reporting objectives are?

  • UR - Post funding Research Plan and user needs to start.

Team availability (e.g., Leave & Events):

  • Ade A (A/L) 13th -17th March

  • Stan(A/L) 13th -17th March

  • Jay (A/L) 13th –31st March

  • Yafang (A/L) 20th – 24th March

  • Pepe 22nd-28th March

  • Ade A (A/L) 27th – 31st March

Non-Kanban work (this iteration):

  1. Review survey results. Can we get a call in with Team?

Work lined up for the iteration

Work lined up for the iteration

 1

Revalidation - Connections

TIS21-3774 - Getting issue details... STATUS - next work in line (for refinement)

TIS21-3874 - Getting issue details... STATUS

2

Merger

TIS21-4290 - Getting issue details... STATUS

TIS21-4289 - Getting issue details... STATUS

TIS21-4293 - Getting issue details... STATUS

Revalidation Connections - Overview

Summary of work done and work to do - formation of a delivery plan
https://hee-tis.atlassian.net/l/cp/zd0imJxs

3

ESR

Ready → File management → TIS21-146 - Getting issue details... STATUS

4

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 &TIS21-2403.

?

5

Bulk Upload

TIS21-3949 - Getting issue details... STATUS

6

Data work

7

Technical improvement

8

Revalidation reporting research / discovery

In progress → UR - TIS21-4013 - Getting issue details... STATUS

Resolve Alpha approach

9

Post funding UR

Research plan and user mapping

Start the research

10

Retro actions

TIS21-4318 - Getting issue details... STATUS

TIS21-4319 - Getting issue details... STATUS

 

TIS21-4217 - Getting issue details... STATUS

TIS21-4282 - Getting issue details... STATUS

TIS21-4283 - Getting issue details... STATUS

11

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

Goal(s) for the next Iteration:

Statement: Revalidation Connections MVP

Focussing on

  • Designated Body changes - Can we be clear what we doing before 27th to test and investigate and what we are doing after 27th to implement. This may include a tail for further work after the codes have been changed.

  • Revalidation connections - What value can we deliver?

  • To produce a delivery plan for the Connections work. This may determine whether we stop supporting Revalidation V1 on 27th March.

  • Post funding Research Plan and user needs to start. Is this an epic to be created?

Team availability (e.g., Leave & Events):

  • User Research Sessions - a number of the team

  • James H (A/L)   27 Feb- 3rd March

  • Cai(A/L) 6th -10th of March

  • Ade A (A/L) 13th -17th March

  • Stan(A/L) 13th -17th March

  • Jay (A/L) 13th –31st March

  • Jay 10th March

  • Cai 3rd March

Non-Kanban work (this iteration):

  1. Collate ESR work, specifically list of issues. Planning to get a call in. Rob/?Pepe Should happen in the next two weeks, but keeps being bumped. Would like to review Stan’s work as that may help frame the first meeting with ESR Leads.

  2. Review survey results. Can we get a call in with Team.

Work lined up for the iteration

Work lined up for the iteration

 1

Revalidation - Connections

TIS21-3774 - Getting issue details... STATUS - next work in line (for refinement)

TIS21-3874 - Getting issue details... STATUS

Look at TIS21-4041 - Getting issue details... STATUS from infrastructure Epic (M effort)

Revalidation Connections - Overview

Epic summary

TIS21-3592 - Getting issue details... STATUS (2 done and 1 in BL -3734)

TIS21-3594 - Getting issue details... STATUS (1 done and 2 BL - 3772 and 3769)

TIS21-3595 - Getting issue details... STATUS (1 done and epic completed)

TIS21-3596 - Getting issue details... STATUS (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***)

TIS21-3735 - Getting issue details... STATUS (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above).


Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 >>> the prerequisite is getting the epics completed. <<<

3

Revalidation reporting research / discovery

In progress → UR - TIS21-4013 - Getting issue details... STATUS

Next step Alpha? This is primarily data/ user research/? usability testing work so assume no impact on developers (is this a correct assumption)-

4

ESR

Ready → File management → TIS21-146 - Getting issue details... STATUS

5

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 &TIS21-2403.

6

Bulk Upload

TIS21-3949 - Getting issue details... STATUS

7

Data work

ESR reporting →

8

Technical improvement

9

Retro actions

(new) Fiaz liaison → TIS21-4103 - Getting issue details... STATUS

 

TIS21-4217 - Getting issue details... STATUS

TIS21-4282 - Getting issue details... STATUS

TIS21-4283 - Getting issue details... STATUS

10

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

Goal(s) for the next Iteration:

Statement:

Focussing on

  • Revalidation connections - to deliver value

  • To define the MVP delivery plan so it can be socialised

  • To continue UR work on reporting into Alpha

Team availability (e.g., Leave & Events):

  • User Research Sessions - a number of the team

  • Pepe A/L 7 Feb-20th Feb

  • Steve A/L 13 Feb -17th Feb

Non-Kanban work (this iteration):

  1. Post funding. Planning to get a call in with James, Ade B, Ade A and Rob

  2. Collate ESR work, specifically list of issues. Planning to get a call in. Rob/?Pepe

  3. Review survey results. Meeting to be planned in to discuss findings with the involvement

Work lined up for the iteration

 1

Revalidation - Connections

TIS21-3774 - Getting issue details... STATUS - next work in line (for refinement)

TIS21-3874 - Getting issue details... STATUS

Look at TIS21-4041 - Getting issue details... STATUS from infrastructure Epic (M effort)

Revalidation Connections - Overview

Epic summary

TIS21-3592 - Getting issue details... STATUS (2 done and 1 in BL -3734)

TIS21-3594 - Getting issue details... STATUS (1 done and 2 BL - 3772 and 3769)

TIS21-3595 - Getting issue details... STATUS (1 done and epic completed)

TIS21-3596 - Getting issue details... STATUS (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***)

TIS21-3735 - Getting issue details... STATUS (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above).


Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 >>> the prerequisite is getting the epics completed. <<<

3

Revalidation reporting research / discovery

In progress → UR - TIS21-4013 - Getting issue details... STATUS

Next step Alpha? This is primarily data/ user research/? usability testing work so assume no impact on developers (is this a correct assumption)-

4

ESR

Ready → File management → TIS21-146 - Getting issue details... STATUS

5

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 &TIS21-2403.

6

Bulk Upload

TIS21-3949 - Getting issue details... STATUS

7

Data work

ESR reporting → TIS21-3980 - Getting issue details... STATUS   Stan to create Bug ticket as a follow on work in the iteration.

TIS21-4221 - Getting issue details... STATUS

TIS21-4004 - Getting issue details... STATUS

8

Technical improvement

Trainee team ticket we need sight of → TIS21-532 - Getting issue details... STATUS

9

Retro actions

(new) Workshop for Jira → TIS21-4102 - Getting issue details... STATUS

(new) Fiaz liaison → TIS21-4103 - Getting issue details... STATUS

  TIS21-4133 - Getting issue details... STATUS

TIS21-4217 - Getting issue details... STATUS

10

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

Goal(s) for the next Iteration:

Statement:

Focussing on

  • Revalidation connections - to deliver value

  • To define the MVP delivery plan so it can be socialised

  • To continue UR work on reporting into Alpha

Team availability (e.g., Leave & Events):

  • User Research Sessions - a number of the team

  • Anita on A/L 2nd Feb -10 Feb

  • 13 Feb on A/L

  • Rob to confirm A/leave next week?

  • Pepe A/L 7 Feb-20th Feb

  • Everyone: Hack Retro TBC

Non-Kanban work (this iteration):

  1. Post funding. Planning to get a call in. y

  2. Collate ESR work, specifically list of issues. Planning to get a call in. y

  3. Review survey results (pre-refinement/refinement this iteration). Perhaps Stan can help with result analysis? y

Work lined up for the iteration

 1

Revalidation - Connections

Complete → TIS21-4116 - Getting issue details... STATUS Will this unblock the rest of Connections. If so, what next? Investigation

TIS21-3774 - Getting issue details... STATUS - next work in line (for refinement)

TIS21-3874 - Getting issue details... STATUS

Look at TIS21-4041 - Getting issue details... STATUS from infrastructure Epic (M effort)

Revalidation Connections - Overview

Epic summary

TIS21-3592 - Getting issue details... STATUS (2 done and 1 in BL -3734)

TIS21-3594 - Getting issue details... STATUS (1 done and 2 BL - 3772 and 3769)

TIS21-3595 - Getting issue details... STATUS (1 done and epic completed)

TIS21-3596 - Getting issue details... STATUS (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***)

TIS21-3735 - Getting issue details... STATUS (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above).


Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1 >>> the prerequisite is getting the epics completed. <<<

3

Revalidation reporting research / discovery

In progress → UR - TIS21-4013 - Getting issue details... STATUS

Next step Alpha? This is primarily data work so assume no impact on developers (is this a correct assumption)-

4

ESR

Ready → File management → TIS21-146 - Getting issue details... STATUS

5

Programme Membership

Refinement Cross-Team for tickets in backlog TIS21-2399 &TIS21-2403.

6

Bulk Upload

TIS21-3949 - Getting issue details... STATUS

7

Data work

ESR reporting → TIS21-3980 - Getting issue details... STATUS   Stan to create Bug ticket as a follow on work in the iteration.

8

Technical improvement

Trainee team ticket we need sight of → TIS21-532 - Getting issue details... STATUS

9

Retro actions

Review attendance → TIS21-4004 - Getting issue details... STATUS

(new) Workshop for Jira → TIS21-4102 - Getting issue details... STATUS

(new) Fiaz liaison → TIS21-4103 - Getting issue details... STATUS

  TIS21-4133 - Getting issue details... STATUS

10

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

Goal(s) for the next Iteration:

Statement:

Focussing on

  • Revalidation connections - to deliver value

  • To define the MVP plan so it can be socialised

  • To start the UR work on reporting

Team availability (e.g., Leave & Events):

  • User Research Sessions - a number of the team

  • Everyone: Hack Day

Non-Kanban work (this iteration):

  1. Recruitment (Tracker) and update from Anita… https://hee-nhs-tis.slack.com/archives/C02EWCJR1MX/p1669895586096139

  2. Post funding. ?

  3. Collate ESR work, specifically list of issues. (Rob)

  4. NI investigation. Ongoing. (Rob)

  5. GMC show and tell - are there thoughts around this?

  6. Want to resurrect user satisfaction survey, but unsure of timings.

  7. Review survey to go out. Perhaps Stan can help with result analysis?

Work lined up for the iteration

1

Revalidation - Connections

Ready → Maven workflow → TIS21-3880 - Getting issue details... STATUS

Agree to rapidly refine TIS21-3774 - Getting issue details... STATUS and put at the top of Ready for Development so it is worked on first.

Then once 3774 is advanced work through what else is brought onto the Kanban.

Look at TIS21-4041 - Getting issue details... STATUS from infrastructure Epic (M effort)

2

Revalidation Connections - Overview

Epic summary

TIS21-3592 - Getting issue details... STATUS (2 done and 1 in BL -3734)

TIS21-3594 - Getting issue details... STATUS (1 done and 2 BL - 3772 and 3769)

TIS21-3595 - Getting issue details... STATUS (1 done and epic completed)

TIS21-3596 - Getting issue details... STATUS (Epic not finished with 5 in the BL - 3958; 3961; 3962; 3963; 3964; 3965 *** we must complete refinement of the stories in this Epic ***)

TIS21-3735 - Getting issue details... STATUS (2 done, 3 BL - 4041; 4038; 4039; 4040. 1 refinement 3774 (re-sync), 3874 in for dev (above).


Can we devise a sequence of work / plan for how we are going to deliver the MVP and associated change inc. decommissioning V1

3

Revalidation-related

Ready → Testing → TIS21-3880 - Getting issue details... STATUS

4

Revalidation reporting research / discovery

In porgress → UR - TIS21-4013 - Getting issue details... STATUS

5

ESR

Ready → File management → TIS21-146 - Getting issue details... STATUS

6

Programme Refactoring

TIS21-2403 - Getting issue details... STATUS to be refined prob Yafang, James and Reuben

7

Data work

In progress

ESR reporting → TIS21-3946 - Getting issue details... STATUS

ESR reporting → TIS21-3980 - Getting issue details... STATUS

Revalidation and Metabase → TIS21-3979 - Getting issue details... STATUS

8

Technical improvement

We’ve got a couple of stories related to Live Defects. We’ll focus on those and the tech platform for Connections.

9

Retro actions

Onboarding → TIS21-4003 - Getting issue details... STATUS

Hack day → TIS21-3986 - Getting issue details... STATUS

Review attendance → TIS21-4004 - Getting issue details... STATUS

(new) Workshop for Jira → TIS21-4102 - Getting issue details... STATUS

(new) Fiaz liaison → TIS21-4103 - Getting issue details... STATUS

TIS21-4134 - Getting issue details... STATUS

10

Roadmap review

Can we just sense check? TIS Admin product roadmap.pptx

Explode-out revalidation to produce a Revalidation Roadmap

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.