Availability

(assume Team Availability Calendar is up to date, otherwise, everyone is available for 12 days: 3 week Sprint, but with 2 Bank Holidays):

Andy
Ashley
Joanne
John S
Matt
Ola
Ray
Reuben
Simon

-5
-1
-8
-6
-1
-1
-1
-4
-6





Sprint Priorities

The following list was the prioritisation output from Sprint Planning:


Product Management

Developer Support

  •  Bulk upload / ESR support and integration testing

North East team support

  •  

Prep for remaining roll-out

  • Prioritisation of P1s and others (including Rotations - especially for London)
  • Relative prioritisation between live feedback and planned development

Development

4Ps and A

  • Stability of NE - triage and fix
  • P1s for other LOs - PO Group to keep under review
  • Testing of P1s - updating tests and retesting - continuing with automation of tests

TIS → NDW ETL

  • TIS data is in tis_interim for further processing. 
  • Support NDW if there are questions regarding the mapping.

ESR

  • Infrastructure set up for ESR and ESR-ETL services to work with tcs.
  • And make the services deployed and available in Dev/Stage and Prod.
  • Initiate the testing on Stage.

Bulk upload

Frontend

  • Bug fixes on displaying errors
  • Now supports placements (changes icon and provides template)
  • Templates now stored in Azure bucket rather than in codebase

Document management

Backend API has now support for

  • Searching tags
  • Download documents

 Frontend changes

  • Now handles all API errors
  • Some test coverage (needs more)
  • Downloads section placed into the person section dropdown
  • Searching with changes now shows confirmation prompt
  • Delete file requires confirmation using new modal component
  • Navigating away with unsaved changs shows unsaved prompt
  • Shows CSS loader animation when fetching data
  • Uses Bootstrap date picker
  • UI tweaks to make list a little clearer

User Management

New roles created

Reval



DevOps



Data

  • Can we get DQ leads to do a more thorough review?




Contents

The following items to be shared by team members during this sprint review


Item

Owner

Description of work

Link to working software
https://apps.tis.nhs.uk/
(note: use Dev for
obfuscated data)
Loom video of completed work
https://www.useloom.com/

Production Application releases / updates:


Simon Meredith (Unlicensed)

Oladimeji Onalaja (Unlicensed)

(and anyone else that needs to conduct a release)

Releases

75 tickets moved to 'Ready to Release' or 'Done' in this sprint:


TIS-39

TIS-40




Product Management

Analysis and refinement:

  • Rotations - Bulk People Import
    • Discussion with data leads and story created for Bulk Rotations import. 
  • Assessment Import Template:
    • Discussion with data leads and agreeing on the fields/validations/rules requirements for the template.  

Developer support:

  • Bulk Uploads
  • ESR Integration Testing:

North East Support:

Prep for remaining rollout:

Rotations

UX/UI: Matt

TIS Admin UI - Removing items and user feedback: TIS Admin UI - Programmes in People - Removing a programme and user feedback

TIS Admin UI Enhancement - UI background and section containers: TIS Admin UI - UI Enhancement - UI background and section containers

TIS User Guide: TIS Admin UI User Guide

TIS Design to development pre Sketch: TIS Design to development - Post April 2018 - Design files and dev notes



DevOps

Chris:

  • Terraform:
  • Document Storage:
    • Mainly blocked by Hicom but created storage account/container, wrote basic integrity checks and modified them when arrived (2018-04-17)
  • Workflow Improvements:
    • Added basic stuff we should have in github i.e: editorconfig, precommit hooks and simple linting on commit.
  • Keycloak:
    • Begun debug of major issues with keycloak configuration including session cookies, mod_auth_oidc_state problems from apache module.

Frederic:

  • ESR, NDW-ETL and Generic Upload deployment process into dev, stage and prod
  • Jenkins documentation, BAU


TIS Core Services: Back end

Post to Programme many to many

  • Changed the One-to-One relationship to Many-to-Many

Rotations

TIS-NDW ETL

  • General refinement of queries to return more accurate data
  • Added support for CurriculumMembership entity
  • Added support forSpecialty entity
  • Added support forProgrammePost entity
  • Automated the daily run of NDW ETL together with DevOps - daily at 7am

Consolidated DR ETL

  • Added support to sincronize ProgrammePost entity betweem Intrepid and TIS databases
  • Added support to sincronize PlacementOtherSpeciality entity betweem Intrepid and TIS databases
  • Fixed issue in Assessment that was preventing CurriculumID from being imported from Intrepid and therefore preventing NDW ETL from exporting Programme, Curriculum and Specialty data to NDW databases

Bulk Uploads - People and Placements

Reference data refresh

Back end field validation improvements

Revalidation converted to work against TIS rather than Intrepid




TIS Core Services: Front end

Bulk Uploads

Document Management

  • Added support to dowload documents
  • Added support to search and retrieve tags

Multi-Select Widget - Person:Roles

  • Review, Update and Maintain E2E across components

New Dropdowns

NPN feedback to user following Post creation

Panos


Rotations

  • CRUD - Create, Edit, Delete (soft) 
  • List View/ FIlters
  • Unit testing
  • People-ProgrammeMembership - SIngle select field added fot Rotation



ESR Integration

Former user (Deleted)

Ashley Ransoo




Data Quality

Data_quality colleagues




Resource Planning

Agency update

Full Time recruitment