Availability

(assume Team Availability Calendar is up to date, otherwise, everyone is available for 12 days: 3 week Sprint, but with 2 Bank Holidays):

Andy
Alistair
Ashley
Ify
Joanne
John S

-7
-3
-1
-2
-3
-2





Sprint Priorities

The following list was the prioritisation output from Sprint Planning - largely a stabilisation Sprint:


Product Management

Developer Support

  •  

North East team support

  •  

Prep for remaining roll-out


Development

4Ps and A

TIS → NDW ETL

  •  

ESR

  •  

Bulk upload

Document management

User Management

  • Enable UserAdmins to update user roles and local offices via key cloak
  • Add new HEE Roles for live users.

Reval



DevOps

  • Document Storage
  • Logging corrections



Data




Contents

The following items to be shared by team members during this sprint review


Item

Owner

Description of work

Link to working software
https://apps.tis.nhs.uk/
(note: use Dev for
obfuscated data)
Loom video of completed work
https://www.useloom.com/

Production Application releases / updates:


Simon Meredith (Unlicensed)

Oladimeji Onalaja (Unlicensed)

(and anyone else that needs to conduct a release)

Releases





Product Management

Analysis and refinement: Data validation (reference tables TIS UI Fields - Dropdowns, management of delete/inactive values Admin UI - Deletion and BE and FE validation for People)

Developer support: Bulk uploads, Rotations

North East Support: Bulk uploads, on going support and Trust user training

Yorkshire and Humberside roll-out: ongoing support. Main issues around assessment and Post creation and disestablishment functionality

Prep for remaining roll-out: BAU tickets (refinement, investigation & reporting), plan for new Jira board and ticketing process agreed (to be tested in next sprint)

UAT: Front end testing and ticket raised to supplement automated testing/BAU tickets/ongoing development


UX/UI: Matt

TIS User guide - Bulk uploads and Templates: TIS User Guide

TIS Admin guide - Creating an account in TIS: TIS Admin guide

TIS Admin L3 Tabular navigation: TIS Admin UI - UX Enhancement - L3 Tabs in (People)

TIS Design to development document - To be scheduled through epic: TIS Design to development: March 2018 - Present: Design files and dev notes

TIS update to design files: All files that are relevant have been updated to meet the current state of TIS and have included the UX/UI work that is scheduled. This will hopefully help when development begins on each piece of design work. All design files are listed in the document above.



DevOps

Document Storage: Document Storage completed from Operations perspective. Files uploaded in around an hour. Scanned in a day and metadata being patched as of 01/05/18.

Workflow Improvements:

Keycloak:

ESR: go live preparations

NDW-ETL and Generic Upload are live

Jenkins documentation



TIS Core Services: Back end

Paul

BAU: fix to national post numbers, speed issues

Post to Programme many to many

Rotations

TIS-NDW ETL

Consolidated DR ETL

Bulk Uploads - People and Placements

Reference data refresh

Back end field validation improvements

Revalidation converted to work against TIS rather than Intrepid




TIS Core Services: Front end

Panos

  • Programme memberships
  • Site names to siteKnowAs where it was possible
  • Redirect to Log In page when keycloak session is expire
  • Update user details every 15 mins (for receiving updates on user permissions)
  • Fix on time needed to get post results on search on placements
  • Fixed security vulnerability on an NPM dependency
  • Disabled browser autocomplete on latest dropdown component
  • Updated build target enviroments


Bulk Uploads

Document Management

Backend:

Frontend:

Multi-Select Widget - Person:Roles

Rotations

Slow Loading Messages

E2E Testing:





ESR Integration

Former user (Deleted)

Ashley Ransoo




Data Quality

Data_quality colleagues




Resource Planning

Agency update

Full Time recruitment