Context: For the Connections epic, the following stories were tested to ensure full coverage of acceptance criteria and user feedback.
| Story reference (enter name & ticket link) | Expected outcome | Actual outcome | Comments | Last updated date |
---|
1 | https://hee-tis.atlassian.net/browse/TISNEW-4667 | Reval Admin should be able to navigate to connection page view connection summary list select line items able to navigate to other reval space from connection space (concerns or recommendations)
| Checked and met the expected outcome | | 01/12/2020 |
2 | https://hee-tis.atlassian.net/browse/TISNEW-5094 | Reval Admin should be able to see the refresh button on any connection screen get the latest connection status when click on the refresh button. these outcomes should be implemented on all concerns and recommendations screens** ?
| You can only see the refresh button on the summary pages of Connections, Concerns and recommendations. | Do we need the refresh button on the detailed pages? | 01/12/2020 |
3 | https://hee-tis.atlassian.net/browse/TISNEW-4361 | A ‘disconnected’ trainee on TIS should be automatically flag 'Connected' on Reval connections page (when page is refreshed) if the following are done on TIS/TCS: a programme membership is added And the programme have a start date which = today or older than today And programme end date in the future which = tomorrow and all future dates
| Checked and met the expected outcome. Created a programme membership for GMC 1393044 - Richard Weaver | | 01/12/2020 |
4 | https://hee-tis.atlassian.net/browse/TISNEW-4362 | A trainee is automatically flagged ‘disconnected’ on Reval connections summary table if the trainee on TIS/TCS is; a new trainee added with no programme start and end dates in TIS/TCS an existing trainee on TIS/TCS but do not have a programme start date an existing trainee on TIS/TCS but have a start date in the future an existing trainee on TIS/TCS but do not have a programme end date an existing trainee on TIS/TCS but programme end date expired/in the past an existing trainee on TIS/TCS but do not have a programme
| Checked and met the expected outcome. Use GMC 1393044 - Richard Weaver to check each criteria | Without a programme start and end date you cannot create a programme membership on TIS as they are mandatory fields | 01/12/2020 |
5 | https://hee-tis.atlassian.net/browse/TISNEW-5263 | On Connections summary page, Reval Admin should be able to do the following to connections: | Checked and met the expected outcome. | | 01/12/2020 |
6 | https://hee-tis.atlassian.net/browse/TISNEW-4064 | Reval Admin should be able to Select Connections from Revalidation filter button Navigate to connection space from either concerns or recommendations Navigate from Connections page to either concerns or recommendation View the summary list on the connections space Select each line items
| Checked and met the expected outcome. | | 01/12/2020 |
7 | https://hee-tis.atlassian.net/browse/TISNEW-5537 | User should be able to sort connections summary by first name is descending order without any issue. | Checked and met the expected outcome. | | 01/12/2020 |
8 | https://hee-tis.atlassian.net/browse/TISNEW-5753 | | | | |
9 | https://hee-tis.atlassian.net/browse/TISNEW-4272 | | | | |
10 | https://hee-tis.atlassian.net/browse/TISNEW-4271 | | | | |
11 | https://hee-tis.atlassian.net/browse/TISNEW-5704 | | | | |
Add Comment