Sprint Priorities
The following list was the prioritisation output from Sprint Planning:
Availability:
Emanuele - 2 day
Joanne - 7.5 days
Alistair - 7 days
Simon - 6 days
Russ - 2 days
Jagadeesh - 7 days
Fayaz - 7 days
Product Management
Rationalise MVP stories from TIS Project across to TISDEV
Bulk upload people support
ESR mapping support
Assessments - support UI development
Reporting - standard reports through to Kais for development
Tech review of Case Management / Concerns Log
Next level definition on MVP - Capture agreements
Review approach to Trust engagement
Development
Migrate to DR V2
ETL refactoring
Create User automation
Oriel - complete to load data into TIS Production
Assessments - ETL / UI
Bulk upload People
DevOps
Deployments: We need to get to the point where we can release during working hours - Blue / Green
Move MySQL databases to managed service
Support HEE OPS with IE11 and compatibility mode across the organisation
Data
People to Owner relationship to implement
Ongoing data purification on Posts/Placements/Programmes
Contents
The following items to be shared by team members during this sprint review
Item | Owner | Link |
---|
Production Application releases / updates:
| | |
Product Management | |
Reporting - Discussion opened up with BM's. Proposed solutions overview run through. Outcome of which are:
- Data analysts group – Process component should be defined by the business on how to drive the data output
- Local Offices to be involved with Data analysts group to ensure their current reporting tools/standards still work when TIS go live
- Local Offices to provide examples of reports currently used that could be created by Kais and/or JT to test the validity of the proposed plan.
- High level overview of data warehouse presented by Kais - Data marts in the data warehouse will need to have data refreshed more often if not real time.
Reviews UX reviews of current build. Created 3 lists 01 List - current implementation that does not match design 02 List - designs created and not currently implemented 03 List - small tweaks to improve existing implementation (small design work needed) https://hee-tis.atlassian.net/wiki/x/JgCKCQ
Revised mega menu/ navigation based on review Menu: With current low Navigation L2 item content the mega menu is not working creating a disconnection between parent and children navigation items and excessive mouse travel. We need to either 1/ move content to sit under relevant menu item NOT justified to the left in the existing mega menu band or 2/ make individual menu drop downs. Menu can always switch back to original mega menu when content grows. Menu Indicators: Add Page indicator to L2 items Subtitles for MM Admin UI/Admin Looking at not available L2 items Trainee Menu: Implement page highlight New back button on L2 mobile menu https://hee-tis.atlassian.net/wiki/x/GIB5CQ |
Intrepid Data Quality | Russell Steel (Unlicensed) | |
TIS Core Services Alpha build | | Post People - Form validation on all required fields now set to trigger on form load. This now applies to all forms currently in TCS with a 'Create' method (.i.e Programme, Curricula).
Extras |
Intrepid Mirror | | - Upgraded the Mirror hardware which was limiting the ingest performance
|
Intrepid DR v2 | Graham O'Regan (Unlicensed) Russell Steel (Unlicensed) | - waiting on Hicom to relase the following DRv2 fixes;
vwCPPSPsychologicalReportOverview - currently only contains 1 column;
- vwCCPSCaseClose. CaseCloseReason field should be displaying a text reason, but is instead showing a system GUID.
|
Intrepid ETLs | Chris Mills (Unlicensed) Paul Hoang (Unlicensed) Russell Steel (Unlicensed) | - Simplified the ingest code to make it more performant and easier to understand and optimise.
- Fayaz Abdul (Unlicensed) moved the ETLs onto their own machine which allows us to debug seperately the 'out of memory' issue and provide a better space for running such large jobs.
|
Oriel Integration | Graham O'Regan (Unlicensed) Sunil Rochani (Unlicensed) | - Download Inbound xml file, parse it and upload parsed data to TIS
|
ESR Integration | Graham O'Regan (Unlicensed) Tamer Moustafa (Deactivated) | - Sent Inbound file to ESR, they asked some questions that have been clarified and they have asked for a larger file to test against
- Raised issue around the deanery mappings that ESR use.
|
DevOps | |
- Blue/green changes are ready in development, planning to release over the weekend.
- (This will enable development to deploy code without massivly affecting the live system and roll back their changes if they see any issues on the seperate instance removing the blocker/possible implications of 'Friday Deploys')
- Separate Elastic search server and ETL server
- (Removes any possible issues caused by having a hefty system such as elastic search on the same system as other services. Applications are now split off anything that could affect them increasing resiliancy)
- Migration of Hosted Docker repositority onto Azure Container Registry.
- (We now no longer need to be running another instance just for our hosted images. They're backed up automatically and managed by Azure, moving more of our infrastructure into Azure's management)
- Added helper scripts to assist creation of docker-compose files from application.yml files.
- (Speeds up DevOps development and improves onboarding of new Ops staff)
- Added pipeline and files for Oriel ETL and ESR ETL
- Created mock SFTP server for Oriel Testing
- Refactored a number of playbooks for latest Ansible
|
Resource Planning | Reuben Noot (Deactivated) | Full Time recruitmentWelcome to John Simmons (Deactivated) our new DevOps Engineer, started last week Still waiting dates on SDIT, FE Dev and User Researcher - awaiting confirmation and start dates
|