Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Welcome

  • Overviews of the iteration

  • Any interruptions / Live Defects

  • Team going through what they’ve achieved during the iteration

  • Feedback from those on the call on what we have done (constructive criticism / praise / questions)

  • Collaboration with those on the call on what to do next

  • Ask questions:

- out loud on the call - really, we’d appreciate you doing this!;
- write in the Team meeting chat; or
- fill in the post-Review survey after the call
(for questions that occur after the call is over, or if you don’t want to ask the question during the call for whatever reason, and
for letting us know whether the Review meets your expectations, or whether you have some suggestions for improvement)

Live Issues:

Jira Legacy
serverSystem JIRA
columnskey,summary,created,updated,status
maximumIssues20
jqlQueryproject = TIS21 AND issuetype = LiveDefect AND ((created >= 2021-11-09 AND created <= 2021-11-23) OR (status changed to done after "2021/11/09 11:00")) order by created DESC
serverId4c843cd5-e5a9-329d-ae88-66091fcfe3c7

Incident logs

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')

Area

Description

Team Representative

Demo - from Prod URL where feasible

Trainee Self-service (TSS)

Revalidation

Map GMC Status to TIS outcomes

Cai Willis or Joseph (Pepe) Kelly

Image RemovedImage RemovedImage AddedImage Added

  • Example in 3rd row of an updated record

  • Some legacy data is an issue (e.g. incorrect GMC status) which will be handled through DQ processes

Production use of Reval

Trainee Information System (TIS)

Remove Validation on Qualifications' Medical School

Joseph (Pepe) Kelly

Image RemovedImage Added

https://apps.tis.nhs.uk/admin/people/person/279584/edit-qualifications

https://stage-apps.tis.nhs.uk/admin/people/person/47165/edit-qualifications

Fix: set curriculumMembership ID as programmeMembership ID for assessment

Yafang Deng

Quick explanation.

Rework available placement grade

Reuben Roberts

This is the first step on a larger piece of work to clean up the grades associated with posts and placements. Placement grades previously defaulted to the approved grade of the applicable post, but any of the ‘Other’ grades for the post could be used as well. As any current grade can be associated with a post, and hence with a placement, a number of inappropriate non-training / non-placement grades are in use, as well as now-inactive grades.

This initial work allows only a limited selection of placement grades is to default the grade on placement to null on creation and allow only current placement grades that are training grades to be associated with new or edited placements, regardless of the placement post. Existing placement grades grades attached to the post. This is both via TIS front end and the Placement bulk uploads.

Retrospectively, grades attached to existing placements are unaffected.

Subsequent work will apply similar restrictions to the selection of grades for creating or editing posts themselves, and after existing post grades have been reviewed and cleaned by data leads, placement grade selection will once again be limited to the particular subset of appropriate placement grades associated with their post.

Electronic Staff Record (ESR)

Northern Ireland Medical and Dental Training Agency (NIMDTA)

Objective Key Results (OKRs) 2021/22 Q3:

OKR

1st
Iteration

2nd
Iteration

3rd
Iteration

4th
Iteration

5th
Iteration

6th
Iteration

7th (Xmas)
Iteration

Objective: Complete the TSS 2nd pilot and release Reval MVP

Key Result#1: Negative TSS User feedback declines as a proportion of overall feedback

0.2

0.3

0.5

Key Result#2: Number of users that have authenticated and submitted their Form R using TSS exceeds 90% of pilot Trainees

0.2

0.5

0.8

Key Result#3: All Reval Admins switch to using Reval rather than GMC for Recommendations

0.1

0.1

0.1

TIS team development (following external review)

Last Review I highlighted that we recently had an external review of how we work within the TIS team. From that review, a number of recommendations were put forward for how we can alter things going forward. The whole team is actively working towards implementing these recommendations. As we are a team that at its core believes in transparency and openness, we decided to give you a flavour of what we have been working on:

...

During Iteration #4

  • .

TIS interim roadmap:

Trello board
urlhttps://trello.com/b/I2KstFzF/tis-interim-roadmap
height760px

Feedback

We really do welcome any feedback you have for us - whether it be negative or positive, or whether it be a suggestion of something we could try/incorporate in a future Review. We absolutely don’t want to stand still. We’re very happy applying the 12th Agile principle of ‘becoming more productive’ to our Reviews themselves! Your contributions to this survey are entirely anonymous, should you wish to include anything others might perceive as controversial. We welcome any and all feedback, as long as it is constructive!

...