Sprint Priorities
The following list was the prioritisation output from Sprint Planning:
Availability:
Emanuele - 2 day
Joanne - 7.5 days
Alistair - 7 days
Simon - 6 days
Russ - 2 days
Jagadeesh - 7 days
Fayaz - 7 days
Product Management
Rationalise MVP stories from TIS Project across to TISDEV
Bulk upload people support
ESR mapping support
Assessments - support UI development
Reporting - standard reports through to Kais for development
Tech review of Case Management / Concerns Log
Next level definition on MVP - Capture agreements
Review approach to Trust engagement
Development
Migrate to DR V2
ETL refactoring - performance and stability
Create User automation - becomes a non-developer task
Oriel - complete to load data into TIS Production
Assessments - ETL / UI
Bulk upload People
DevOps
Deployments: We need to get to the point where we can release during working hours - Blue / Green
Move MySQL databases to managed service
Support HEE OPS with IE11 and compatibility mode across the organisation
Data
People to Owner relationship to implement
Ongoing data purification on Posts/Placements/Programmes
Contents
The following items to be shared by team members during this sprint review
Item | Owner | Link |
---|
Production Application releases / updates:
| | |
Product Management | |
Reporting - Discussion opened up with BM's. Proposed solutions overview run through. Outcome of which are:
- Data analysts group – Process component should be defined by the business on how to drive the data output
- Local Offices to be involved with Data analysts group to ensure their current reporting tools/standards still work when TIS go live
- Local Offices to provide examples of reports currently used that could be created by Kais and/or JT to test the validity of the proposed plan.
- High level overview of data warehouse presented by Kais - Data marts in the data warehouse will need to have data refreshed more often if not real time.
UX / Ui Review Transferred the 3 review lists into confluence, rewriting/renumbering to make clearer - linking screen caps and design PDFs Covering: 01 implementation that does not match design 02 designs created and not currently implemented 03 small tweaks to improve existing implementation (small design work needed) These now need to be written into dev stories https://hee-tis.atlassian.net/wiki/x/JgCKCQ
Revised mega menu/ navigation based on review Menu: With current low Navigation L2 item content the mega menu is not working creating a disconnection between parent and children navigation items and excessive mouse travel. We need to either 1/ move content to sit under relevant menu item NOT justified to the left in the existing mega menu band or 2/ make individual menu drop downs. Menu can always switch back to original mega menu when content grows. Menu Indicators: Add Page indicator to L2 items Subtitles for MM Admin UI/Admin Looking at not available L2 items Trainee Menu: Implement page highlight New back button on L2 mobile menu https://hee-tis.atlassian.net/wiki/x/GIB5CQ |
Intrepid Data Quality | Russell Steel (Unlicensed) | |
TIS Core Services Alpha build | | Post People - Form validation on all required fields now set to trigger on form load. This now applies to all forms currently in TCS with a 'Create' method (.i.e Programme, Curricula).
Extras |
Intrepid Mirror | | - Upgraded the Mirror hardware which was limiting the ingest performance
|
Intrepid DR v2 | Graham O'Regan (Unlicensed) Russell Steel (Unlicensed) | - waiting on Hicom to relase the following DRv2 fixes;
vwCPPSPsychologicalReportOverview - currently only contains 1 column;
- vwCCPSCaseClose. CaseCloseReason field should be displaying a text reason, but is instead showing a system GUID.
|
Intrepid ETLs | Chris Mills (Unlicensed) Paul Hoang (Unlicensed) Russell Steel (Unlicensed) | - Simplified the ingest code to make it more performant and easier to understand and optimise.
- Fayaz Abdul (Unlicensed) moved the ETLs onto their own machine which allows us to debug seperately the 'out of memory' issue and provide a better space for running such large jobs.
|
Oriel Integration | Graham O'Regan (Unlicensed) Sunil Rochani (Unlicensed) | - Download Inbound xml file, parse it and upload parsed data to TIS
|
ESR Integration | Graham O'Regan (Unlicensed) Tamer Moustafa (Deactivated) | - Sent Inbound file to ESR, they asked some questions that have been clarified and they have asked for a larger file to test against
- Raised issue around the deanery mappings that ESR use.
|
DevOps | |
- Blue/green changes are ready in development, planning to release over the weekend.
- (This will enable development to deploy code without massivly affecting the live system and roll back their changes if they see any issues on the seperate instance removing the blocker/possible implications of 'Friday Deploys')
- Separate Elastic search server and ETL server
- (Removes any possible issues caused by having a hefty system such as elastic search on the same system as other services. Applications are now split off anything that could affect them increasing resiliancy)
- Migration of Hosted Docker repositority onto Azure Container Registry.
- (We now no longer need to be running another instance just for our hosted images. They're backed up automatically and managed by Azure, moving more of our infrastructure into Azure's management)
- Added helper scripts to assist creation of docker-compose files from application.yml files.
- (Speeds up DevOps development and improves onboarding of new Ops staff)
- Added pipeline and files for Oriel ETL and ESR ETL
- Created mock SFTP server for Oriel Testing
- Refactored a number of playbooks for latest Ansible
|
Resource Planning | Reuben Noot (Deactivated) | Full Time recruitmentWelcome to John Simmons (Deactivated) our new DevOps Engineer, started last week Still waiting dates on SDIT, FE Dev and User Researcher - awaiting confirmation and start dates
|
Add Comment