Current MVPs and likely next increment
This is a page designed to:
confirm what we’re currently working on as a team
confirm what the MVPs (and likely next increments) are for those things we’re working on - in bulleted prose (for communication with the wider business, not as a checklist of development for ourselves)
track changes to these things over time, such that we always have clarity on MVP of work (or the next increment, once we’ve delivered the MVP) as an ‘elevator pitch’ when communicating with stakeholders
provide a high level estimate of # of iterations to complete listed work
[Note to TIS Team: please try to provide an estimate range that gives an indication of both:
- an optimistic best estimate (whole team effort, with the team free from distractions); and
- a pessimistic worst estimate (including factors like: team needing to work on other things; upcoming leave; expected LiveDefects (avg from previous iterations); new starters/leavers; maintenance requests on other services…)]
Status | Work area | Date | Description |
---|---|---|---|
Estimated | Reval Connections MVP8-20 Iterations | Oct 14, 2022 | Connections MVP, For permanent removals, we need to clear up the whole…
|
Done | TIS Self-Service MVP1 Iteration left | Mar 17, 2021 | First cohort of Trainees (c.50, from across LOs, all of whom will be at the point of needing to fill in their Form Rs imminently):
HEE Admin:
2021-04-14 - Outstanding estimate of a few days, before doing some live run throughs and quick fixes, before starting the Pilot. 2021-01-08 - Original estimation: 3-4 iterations (mid-Feb --> Mid-Mar) 2021-02-05 - Progress and revised estimation: (1st → 3rd week in March) 2021-02-12 - 4/5 confidence estimate still holds 2021-02-22 - Updated. Behind due to sync service speed issues, interruptions (live defects and other essential TIS/ESR Work) and holidays. 2021-03-05 - Updated. Resolved majority of performance issues. Back to a 1-2 Iterations remaining estimate. 2021-03-17 - Updated. Tidying up sync stuff, and address TISSS Feedback tickets in Backlog/Refinement
|
Done | NIMDTA TIS MVP | Aug 18, 2021 | All requested Intrepid NIMDTA admins users onboarded on, and are administering Trainees within NI exclusively from the NIMDTA TIS app, the NIMDTA Intrepid app is read-only and can be switched off. NIMDTA Admins' Administration of Trainees includes:
HEE Admins will also be able to:
(Note: for MVP, real-time data synchronisation between TIS and NIMDTA TIS is not yet in place) Data sync of person details |
Split into smaller MVPs | Reval MVP | Aug 18, 2021 | Operations & Access
Application
2021-04-16 - Updated estimate range (optimistic → pessimistic) of what has been requested 13-23 Iterations (6-12 months).
|
Slack: https://hee-nhs-tis.slack.com/
Jira issues: https://hee-tis.atlassian.net/issues/?filter=14213