Admin Team Planning 2024

What is the purpose of planning?

  1. Identify goal(s) and what needs to be done and ID specific stories against the goal(s)

  2. Planning tickets to bring into Ready for Dev to work on (most of which to complete) in next iteration.

  3. Ditto above, plus check the capacity of the team in the next two weeks (availability etc)

  4. Resolve prioritisation / sequencing

  5. Assessing work in progress on the board against refreshed goals

  6. Planning is not a refinement session - this is what the Refinement session

TA-JiraDash: Issue summary report - JIRA (atlassian.net)

 

 

Dec 4, 2024

FOCUS

  • Post Funding - no development - need to take stock and plan implementation

  • Keycloak to Cognito - primary focus towards implementation on 11 Dec (target) and post wash-up

  • Revalidation research - should run an ideation session this iteration (carried over from last)

  • Address curriculum bulk upload - raised at review and after inquiry this is the time to do it in the prep new trainees et al.

Team availability (e.g., Leave & Events)

  • Tobi - 22nd - 10th Dec.

  • WT&E Awayday 10 Dec

  • _________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding https://hee-tis.atlassian.net/browse/TIS21-3273

https://hee-tis.atlassian.net/browse/TIS21-161 ****

2

Keycloak-Cognito https://hee-tis.atlassian.net/browse/TIS21-1931

https://hee-tis.atlassian.net/browse/TIS21-5887 BLOCKED
https://hee-tis.atlassian.net/browse/TIS21-2486 BLOCKED

https://hee-tis.atlassian.net/browse/TIS21-6616

https://hee-tis.atlassian.net/browse/TIS21-6687 BLOCKED

https://hee-tis.atlassian.net/browse/TIS21-6750

https://hee-tis.atlassian.net/browse/TIS21-6740

https://hee-tis.atlassian.net/browse/TIS21-6739

https://hee-tis.atlassian.net/browse/TIS21-6749

https://hee-tis.atlassian.net/browse/TIS21-6747

 

Possible plan - taken from Slack 15 Nov

  1. Switchover plan:

  • Set up a meeting in early next week (the week commencing Nov 18)

  • Target: have a step by step switchover plan alongside the rollback plan

  1. Comms - discuss with Rob

  • Can we draft and send comms next week (the week commencing Nov 18) ?

  • Only send comms about Prod changes

  • Users will have to use a valid email after switchover

We will also need to notify users on the upcoming changes on Stage (maybe banner on the app)3. Stage switchover

  • Target date: Nov 26

  • We expect to switchover on 26th and then let the key users finish the tests on the same day, and then verify rollback plan.

  • Identify key users to do extended testing.

  • Failure: if deployment fails, and we cannot get Stage fully ready for testing until afternoon, we have to agree to roll back, and then notify users. This will result in a 2nd deployment on Stage on Dec 9

  • Tobi will be on leave, and we need to seek help from Godstime

  1. Prod switchover:

  • Target date: Dec 11

 

Data general https://hee-tis.atlassian.net/browse/TIS21-1135

https://hee-tis.atlassian.net/browse/TIS21-6642

 

Data bulk upload https://hee-tis.atlassian.net/browse/TIS21-1137

https://hee-tis.atlassian.net/browse/TIS21-3819

https://hee-tis.atlassian.net/browse/TIS21-3822

6

Revalidation performance
https://hee-tis.atlassian.net/browse/TIS21-4961

https://hee-tis.atlassian.net/browse/TIS21-6275 flagged!

8

Other work to note

Search https://hee-tis.atlassian.net/browse/TIS21-6328 flagged

Jenkins – https://hee-tis.atlassian.net/browse/TIS21-6448

https://hee-tis.atlassian.net/browse/TIS21-2702

https://hee-tis.atlassian.net/browse/TIS21-6674

9

Bugs and live issues

https://hee-tis.atlassian.net/browse/TIS21-6436 BLOCKED

10

Retro

https://hee-tis.atlassian.net/browse/TIS21-6684

https://hee-tis.atlassian.net/browse/TIS21-6760

12

TSS dependencies

 

13

Roadmap review

 

________________________________________________

 

Nov 20, 2024

FOCUS

  • Post Funding - no development - need to take stock and plan implementation

  • Keycloak to Cognito - primary focus towards implementation

  • Revalidation research - should run a ideation session this iteration

  • Address curriculum bulk upload - raised at review and after inquiry this is the time to do it in the prep new trainees et al.

Team availability (e.g., Leave & Events)

  • James off this week

  • Tobi - 22nd - 10th Dec.

  •  

  • __________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding https://hee-tis.atlassian.net/browse/TIS21-3273

https://hee-tis.atlassian.net/browse/TIS21-161 ****

2

Keycloak-Cognito https://hee-tis.atlassian.net/browse/TIS21-1931

https://hee-tis.atlassian.net/browse/TIS21-5887 BLOCKED
https://hee-tis.atlassian.net/browse/TIS21-2486 BLOCKED

https://hee-tis.atlassian.net/browse/TIS21-6616

https://hee-tis.atlassian.net/browse/TIS21-6687

https://hee-tis.atlassian.net/browse/TIS21-6457

Possible plan - taken from Slack 15 Nov

  1. Switchover plan:

  • Set up a meeting in early next week (the week commencing Nov 18)

  • Target: have a step by step switchover plan alongside the rollback plan

  1. Comms - discuss with Rob

  • Can we draft and send comms next week (the week commencing Nov 18) ?

  • Only send comms about Prod changes

  • Users will have to use a valid email after switchover

We will also need to notify users on the upcoming changes on Stage (maybe banner on the app)3. Stage switchover

  • Target date: Nov 26

  • We expect to switchover on 26th and then let the key users finish the tests on the same day, and then verify rollback plan.

  • Identify key users to do extended testing.

  • Failure: if deployment fails, and we cannot get Stage fully ready for testing until afternoon, we have to agree to roll back, and then notify users. This will result in a 2nd deployment on Stage on Dec 9

  • Tobi will be on leave, and we need to seek help from Godstime

  1. Prod switchover:

  • Target date: Dec 11

 

Data general https://hee-tis.atlassian.net/browse/TIS21-1135

https://hee-tis.atlassian.net/browse/TIS21-6642

 

Data bulk upload https://hee-tis.atlassian.net/browse/TIS21-1137

https://hee-tis.atlassian.net/browse/TIS21-3819

https://hee-tis.atlassian.net/browse/TIS21-3822

6

Revalidation performance
https://hee-tis.atlassian.net/browse/TIS21-4961

https://hee-tis.atlassian.net/browse/TIS21-6275 flagged!

8

Other work to note

Search https://hee-tis.atlassian.net/browse/TIS21-6328 flagged

Jenkins – https://hee-tis.atlassian.net/browse/TIS21-6448

https://hee-tis.atlassian.net/browse/TIS21-2702

9

Bugs and live issues

https://hee-tis.atlassian.net/browse/TIS21-6436 BLOCKED

10

Retro

https://hee-tis.atlassian.net/browse/TIS21-6684

12

TSS dependencies

https://hee-tis.atlassian.net/browse/TIS21-6441

13

Roadmap review

 

________________________________________________

 

 

 

Oct 23, 2024

Team availability (e.g., Leave & Events)

  • Yafang - off two weeks (back 4th Nov)

  • Tobi off 25 Oct

  • Pepe at conference 24/25 Oct

  • James off Nov 1 to 18 Nov

  • Rob may take a day off

  • __________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding https://hee-tis.atlassian.net/browse/TIS21-3273

https://hee-tis.atlassian.net/browse/TIS21-4804

then next…

https://hee-tis.atlassian.net/browse/TIS21-161 ****

 

Re-write / review 2687

2

Keycloak-Cognito https://hee-tis.atlassian.net/browse/TIS21-1931

https://hee-tis.atlassian.net/browse/TIS21-5887 BLOCKED
https://hee-tis.atlassian.net/browse/TIS21-6453
https://hee-tis.atlassian.net/browse/TIS21-2486 BLOCKED

https://hee-tis.atlassian.net/browse/TIS21-6616

https://hee-tis.atlassian.net/browse/TIS21-6457 (early socialisation and input)

Quote from Slack ----- The epic doesn't allow me to order, but my thinking for the following work is:

  1. Revalidation UI & token (2486 imp, 6081 done)

  2. Revalidation API-Gateway (6456 NR)

  3. UserManagement functionality tickets (6435 imp, BL 6491 unrefined, 2704 NR), then switchover ticket (6454 BL unrefined, 6455 BL refined)

  4. User manual (6457 Ready)

  5. lambda with private connection (6453 imp)

 

Data general https://hee-tis.atlassian.net/browse/TIS21-1135

 

4

Local office and DB https://hee-tis.atlassian.net/browse/TIS21-6331

https://hee-tis.atlassian.net/browse/TIS21-6458 small ticket to tidy up

6

Revalidation performance
https://hee-tis.atlassian.net/browse/TIS21-4961

https://hee-tis.atlassian.net/browse/TIS21-6275 flagged!

8

Other work to note

Search https://hee-tis.atlassian.net/browse/TIS21-6328

Tidy up LO changes - https://hee-tis.atlassian.net/browse/TIS21-6458 end of Oct changes for local teams.

9

Bugs and live issues

https://hee-tis.atlassian.net/browse/TIS21-6436

https://hee-tis.atlassian.net/browse/TIS21-6610

https://hee-tis.atlassian.net/browse/TIS21-6637

10

Retro https://hee-tis.atlassian.net/wiki/x/DQC2-g

 

12

TSS dependencies

https://hee-tis.atlassian.net/browse/TIS21-6441

https://hee-tis.atlassian.net/browse/TIS21-6625

13

Roadmap review

 

________________________________________________

 

 

 

Oct 9, 2024

 

Team availability (e.g., Leave & Events)

  • Cai 18-21 (Fri Mon) annual leave

  • Yafang 21st for two weeks annual leave

__________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding https://hee-tis.atlassian.net/browse/TIS21-3273

https://hee-tis.atlassian.net/browse/TIS21-4804

then next…

https://hee-tis.atlassian.net/browse/TIS21-161 ****

https://hee-tis.atlassian.net/browse/TIS21-5813

Re-write / review 2687

2

Keycloak-Cognito https://hee-tis.atlassian.net/browse/TIS21-1931

https://hee-tis.atlassian.net/browse/TIS21-5887
https://hee-tis.atlassian.net/browse/TIS21-6453
https://hee-tis.atlassian.net/browse/TIS21-2486

then next…
https://hee-tis.atlassian.net/browse/TIS21-6435

https://hee-tis.atlassian.net/browse/TIS21-6457 (early socialisation and input)

Quote from Slack ----- The epic doesn't allow me to order, but my thinking for the following work is:

  1. Revalidation UI & token (2486 imp, 6081 done)

  2. Revalidation API-Gateway (6456 NR)

  3. UserManagement functionality tickets (6435 imp, BL 6491 unrefined, 2704 NR), then switchover ticket (6454 BL unrefined, 6455 BL refined)

  4. User manual (6457 Ready)

  5. lambda with private connection (6453 imp)

3

Jenkins security vulnerabilities

 

 

Data general https://hee-tis.atlassian.net/browse/TIS21-1135

 

4

Local office and DB https://hee-tis.atlassian.net/browse/TIS21-6331

https://hee-tis.atlassian.net/browse/TIS21-6458 small ticket to tidy up

6

Revalidation performance
https://hee-tis.atlassian.net/browse/TIS21-4961

https://hee-tis.atlassian.net/browse/TIS21-6275

8

Other work to note

Search https://hee-tis.atlassian.net/browse/TIS21-6328

Tidy up LO changes - https://hee-tis.atlassian.net/browse/TIS21-6458 end of Oct changes for local teams.

9

Bugs and live issues

https://hee-tis.atlassian.net/browse/TIS21-6436

10

Retro https://hee-tis.atlassian.net/wiki/x/DQC2-g

 

12

TSS dependencies

https://hee-tis.atlassian.net/browse/TIS21-6441

13

Roadmap review

 

________________________________________________

 

 

 

Sep 25, 2024

 

Team availability (e.g., Leave & Events)

  •  

  •  

__________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding https://hee-tis.atlassian.net/browse/TIS21-3273

https://hee-tis.atlassian.net/browse/TIS21-4804

then next…

https://hee-tis.atlassian.net/browse/TIS21-161

https://hee-tis.atlassian.net/browse/TIS21-5813

Re-write / review 2687

2

Keycloak-Cognito https://hee-tis.atlassian.net/browse/TIS21-1931

https://hee-tis.atlassian.net/browse/TIS21-5887

then next… 6081 and 6453 bring in

https://hee-tis.atlassian.net/browse/TIS21-6457 (early socialisation and input)

Quoye from Slack ----- The epic doesn't allow me to order, but my thinking for the following work is:

  1. Revalidation UI & token (2486, 6081)

  2. Revalidation API-Gateway (6456)

  3. UserManagement functionality tickets (6435, 6491, 2704), then switchover ticket (6454, 6455)

  4. User manual (6457)

  5. lambda with private connection (6453)

3

Jenkins security vulnerabilities

https://hee-tis.atlassian.net/browse/TIS21-6448

 

Data general https://hee-tis.atlassian.net/browse/TIS21-1135

https://hee-tis.atlassian.net/browse/TIS21-6496

4

Local office and DB https://hee-tis.atlassian.net/browse/TIS21-6331

 

6

Revalidation research https://hee-tis.atlassian.net/browse/TIS21-4634

https://hee-tis.atlassian.net/browse/TIS21-6288 ongoing through iteration

8

Other work to note

Search https://hee-tis.atlassian.net/browse/TIS21-6328

Reval performance https://hee-tis.atlassian.net/browse/TIS21-4961

Tidy up LO changes - https://hee-tis.atlassian.net/browse/TIS21-6458 end of Oct changes for local teams.

Reval improve user experience https://hee-tis.atlassian.net/browse/TIS21-6275

9

Bugs and live issues

https://hee-tis.atlassian.net/browse/TIS21-6436

10

Retro https://hee-tis.atlassian.net/wiki/x/DQC2-g

https://hee-tis.atlassian.net/browse/TIS21-6571

12

TSS dependencies

https://hee-tis.atlassian.net/browse/TIS21-6292

https://hee-tis.atlassian.net/browse/TIS21-6441

13

Roadmap review

TIS Admin product roadmap.pptx

________________________________________________

Sep 11, 2024

 

Team availability (e.g., Leave & Events)

  • Jay off until Mon 23 Sept

  •  

 

__________________________________________________________________________

 

 

 

 

Aug 28, 2024

 

Team availability (e.g., Leave & Events):

Rob - 29-30 August leave

Cai - 2-6 Sept leave

Jay 9-10 Sept

Steve 28 Aug

 

__________________________________________________________________________

 

 

 

 

 

 

Aug 14, 2024

 

Team availability (e.g., Leave & Events):

Jay - 19-23 Aug

Cai - 20 Aug

Steve back 19 Aug

Back Holiday 26 Aug

__________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding https://hee-tis.atlassian.net/browse/TIS21-3273

https://hee-tis.atlassian.net/browse/TIS21-161

https://hee-tis.atlassian.net/browse/TIS21-5813

Need to refine 161 urgently

2

Keycloak-Cognito https://hee-tis.atlassian.net/browse/TIS21-1931

then

3

Local office and DB

James may look at 6294 6293 6284 6283

4

 

 

5

Revalidation research

ongoing through iteration

6

User management research

7

 

 

8

Bugs and live issues

****Blocked****

9

Retro

Nothing this iteration

11

Nothing this iteration

12

 

 

13

Roadmap review

TIS Admin product roadmap.pptx

 

 

 

Jul 30, 2024

 

Team availability (e.g., Leave & Events):

Sarah → on leave to 6 August (back next Wednesday)
Rob → leave Friday 2 August 5 to 7 August (back next Thursday)

Pepe → 6th -13th off
James - 6th -13th off

Tobi - 5th Aug off

__________________________________________________________________________

Work lined up for the iteration

Work lined up for the iteration

1

Post funding

should be resolved iteration

Need to confirm follow-on ticket(s) currently in refinement.

2

Keycloak-Cognito

underway

then

 

3

Local office and DB

OK will be done

next one

James may look at

4

 

 

5

Revalidation research

ongoing through iteration

6

User management research

?

7

 

 

8

Bugs and live issues

may not be completed in iteration

9

Retro

Nothing this iteration

10

ESR Support

11

Nothing this iteration

12

 

 

13

Roadmap review

TIS Admin product roadmap.pptx

 

 

 

Jul 17, 2024

Goal(s) for the next Iteration:

Statement:

 

Team availability (e.g., Leave & Events):

Sarah leave 19th - 7 August.
Cai half day Mon 22nd.

Rob may take some
Yafang and James - recruit disruption (next Wed/Thurs)

 

Work lined up for the iteration

Work lined up for the iteration

 

 

 

 1

ESR Support

  ongoing

 

NINO in NE - what work should be done in this area?

Post Funding

 

3

Cognito Migration


.

Deployment plan informs order of work. Poss some tickets to be ID’ed, refined and poss brought in. 5887

Research - user management

not brought in

 5

 

Local office name change

> comms bring in via refinement

 

 

 

 

Bonus

Bulk update ----

3

Cross team

---

4

Tech - improvement

 From last iteration and continue into new iteration:

6

ESR

 

17

Data

From last iteration and continue into new iteration:

11

Retro actions

 

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

 

Jul 3, 2024

Goal(s) for the next Iteration:

Statement:

 

Team availability (e.g., Leave & Events):

Rob off on leave Friday 5 July

Tobi - 15-17 July

Cai one day possible

Ade 11-12 July

 

Work lined up for the iteration

Work lined up for the iteration

 

 

 

 1

ESR Support

  ongoing

 

NINO in NE

Post Funding

nearly closed

 

Others in refinement can be brought in

3

Cognito Migration


.

6223

Research - user management

(ongoing) Sarah

 5

 

Local office name change

 

 

 

 

Bonus

Bulk update ----

3

Cross team

---

- Naz review

4

Tech - improvement

 From last iteration and continue into new iteration: n - await

  brought into iteration by Andy Dingley with Devops input.

--nongoing

6

ESR

- Tobi looking at ops related Confident being done in iteration. Related to live defect.

17

Data

From last iteration and continue into new iteration:

11

Retro actions

 

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

 

 

 

 

 

Jun 19, 2024

Goal(s) for the next Iteration:

Statement:

 

Team availability (e.g., Leave & Events):

Pepe A/L 19-25th of June

Cai A/L 26th-28th

Non-Kanban work (this iteration):

Support work - wash up around the ESR issues for PEN | LDN | KSS. Seek call with ESR Support to discuss. : Meeting to try understand the cause of what happened.

Handover from Catherine and Ade B.? meeting to be arranged for early next week.

LTFT meeting in London for those able to attend.

GMC Training environment off line Wednesday 19 – Friday 21 June > impact? No impact

Work lined up for the iteration

Work lined up for the iteration

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

Cai to arrange call if need be to support with documentation.

 

Support

 

 

 1

Post Funding

Ongoing peer review/code review

 

2

Cognito Migration

yafang to create a ticket for deployment plan as currently we can’t deploy as for when ready. So to reduce interruption we need a deployment plan.

for AdHoc refinement this afternoon.

3

Revalidation: UR

Touch base with Ade B

4

Other Tech improvement

 From last iteration and continue into new iteration:

  brought into iteration by Andy Dingley with Devops input

6

ESR

ongoing would require Devops input

17

Data work

From last iteration and continue into new iteration:

 

11

Retro actions

 

 

BAs and UR work

 

 

 

 

LTFT Alpha

 UR: Ade B -joint work with trainee team. Ongoing

Ongoing

 

Ade Babalola: LTFT Discovery Plan.xls

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

 

 

 

 

Jun 5, 2024

Goal(s) for the next Iteration:

Statement:

 

Team availability (e.g., Leave & Events):

Yafang A/L : 28th-7th of June

Rob : probably Friday 14th June

Jay will be taking a day but TBC

Non-Kanban work (this iteration): *** noting we should be articulating UR in tickets, so will be Kanban ***

  • User research for user management to be advanced-? possible workshop with the team but TBC by Sarah

  • User research for revalidation to be progressed in lead up a meeting with the revalidation leads- Ade B circulated email to team in preparation for the next leads meeting. Next leads meeting is the 13th

  • Still with a proposed LTFT face-to-face meeting 20th June. Catherine to send out Agenda on One-Tis Channel.

  • ESR (see below)

These are the issues re ESR:

  1. Current problem #1 - The current TIS->ESR problem raised on Friday - this is an incident outside our system but we are supporting the process having said that we have also identified areas we could have acted quicker as a result opportunity for lesson learned therefore there is a need to record actions and event leading to the incident for the purpose of code of practice? confluence page?- Ticket will be created by Pepe with sub tasks to reflects Trusts that required support. Data being sent to Trusts in London, KSS and Peninsular

  2. Current problem #2 - The current ESR->TIS problem (address data) which Anita has clocked around support - this has apparently been going on for a year-

  3. User support - The lack of formalised user support around ESR is an issue - need to understand what users expect in this space

  4. Reporting - A question whether we can produce reports that are more informative - including whether data is flowing ticket around this (6135), but also would like to do some UR to understand other needs or improvements

  5. Understanding ESR - A wider issue over data flows between TIS Admin, TSS and ESR. A simplified view to help people understand the data flows, what data flows, and when.

  6. Review state of ESR - Re-focus on the state of ESR - not sure of the work burden on this.

Kanban

Implementing

  • 3162 - Github M/S (Andy D)

  • 5812 - <Post Funding> Sync job fundingStatus H/M

  • 5752 - <TIS DB to a managed service>DW to cloud native M/S

  • 4648 - TSS investigation M/S for information and feedback?

  • 6108 - UM research plan

 

For development

  • 161 - <Post Funding> Reconcile posts with positions H/M

  • 6080 - <Keycloak-Cognito> Create existing users H/M

  • 4747 - RabbitMQ

  • 6070 - Trial run

  • Unknown ESR tickets

 

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 

  Cai need to close up a support call then move to done.

 

Support

 

 1

Post Funding

Aim to complete in this iteration but aware this may be compromised by the ESR work going on

 

2

Cognito Migration

for AdHoc refinement this afternoon.

5887 was collectively agreed to

3

Revalidation: UR

Touch base with Ade B

4

Other Tech improvement

 From last iteration and continue into new iteration:

  brought into iteration by Andy Dingley. This is a cross team work.

 

 

 

4

Programme Membership

In flight

 

5

TIS assessment

 

6

ESR

 

ongoing

17

Data work

From last iteration and continue into new iteration:

 

11

Retro actions

team to visit page and leave comments then ready to be moved to ‘done’

 

 

BAs and UR work

 

 

 

 

LTFT Alpha

 UR: Ade B -joint work with trainee team. Catherine to touch base with Ade B.

UR revalidation:

Sarah: User management research -

 

Ade Babalola: LTFT Discovery Plan.xls

 

 

12

Roadmap review

TIS Admin product roadmap.pptx

 

 

 

 

May 22, 2024

Goal(s) for the next Iteration:

Statement:

 

Team availability (e.g., Leave & Events):

May Bank Holiday 27th

Yafang A/L : 28th-10th of June

Rob Tues 28th and/or 29th Wednesday off

Non-Kanban work (this iteration):

User management team meeting.

Meeting the Oriel team tomorrow to go through outstanding developments from Hicom. It won't affect the board but will hopefully give clarity on timescales for the ticket blocked in the backlog

 

 

 

Work lined up for the iteration

Work lined up for the iteration

Work lined up for the iteration

Work lined up for the iteration

0

Live Defect

 

 

 

Support

 

 1

Post Funding

Collaborative work between Jay and Yafang but we are mindful that Yafang will be away for the rest of the iteration. Therefore team to step in and support when necessary.

 

2

Cognito Migration

for AdHoc refinement this afternoon.

5887 was collectively agreed to

3

Revalidation: UR

Touch base with Ade B

4

Other Tech improvement

 From last iteration and continue into new iteration:

 

 

 

 

4

Programme Membership

In flight

 

5

TIS assessment

 

6

ESR

 

ongoing

17

Data work

From last iteration and continue into new iteration:

 

11

Retro actions

 

 

BAs and UR work

 

LTFT Alpha

 

Cross-team effort, involving Ade B and Ade A .: Naz to guide through the approach we’re taking with Alpha: ? define MVP for both Trainee and Admin

 

Sarah: User management research to be ticket up for visibility

 

Ade Babalola: LTFT Discovery Plan.xls

 

 

12

Roadmap review

TIS Admin product roadmap.pptx