Sprint 29 Review (2020-10-14 to 2020-10-27)

Welcome

  • Overviews of the Sprint (Reval: Andy | TIS: AndyD | LJ: Phil)

  • Any interruptions / Live Defects

  • Team going through items done squad by squad

  • Feedback from those on the call on what we have done (constructive criticism / praise / questions)

  • Collaboration with those on the call on what to do next

  • Overviews of the Sprint (Reval: Andy | TIS: AndyD | LJ: Phil)

  • Any interruptions / Live Defects

  • Team going through items done squad by squad

  • Feedback from those on the call on what we have done (constructive criticism / praise / questions)

  • Collaboration with those on the call on what to do next

Live Issues:

key summary created updated status
Loading...
Refresh

 

Incident logs

2020-10-19 Operating System automated update, caused wide-scale instability

Dev team demo 'done' work contributing to those goals (no reference to specific Jira tickets, and no reference to work not 'done')

Squad

Area

Team Representative

Demo - from Prod URL where feasible

Squad

Area

Team Representative

Demo - from Prod URL where feasible

ESR Team

Sprint Goal: Showing export status in TIS

@Phil James (Unlicensed)

 

 

 

 

 

 

 

TIS Team

Sprint Goal: Confirming infrastructural architecture for NI

@Andy Dingley

 

TIS Self Service - Cookie/privacy policy notification

@Andy Dingley

 

 

 

 

Revalidation Team

 

Sprint Goal: Creating Reval production infrastructure

@Andy Dingley

 

Allocate Admin - now using live user names

@Babul.Yasa (Unlicensed)

 

Voice over creation of Prod

@Doris.Wong

 

Objective Key Results (OKRs) Financial Q3

TIS Squad (Pepe)

Done

 

Revalidation Squad (Ify)

Done

Obj.

Technical facilitation of the on-boarding of new entities (beginning with NIMDTA this quarter, and to be followed in future by HCS, Pharmacy, and others)

 

Obj.

Replace the Existing Revalidation Module with new Revalidation Module

 

Key R

NIMDTA admins administer their Trainees via TIS / a NIMDTA instance of TIS

 

Key R

A new live/production environment built with a supported connection to GMC

 

Data between England and NIMDTA instances of TIS is digitally synced such that administrators from each entity are able to attach Trainees from the other entities to their Programmes

 

Trainees can be revalidated, their connections can be managed and concerns can be logged

 

Ensure users can view existing TIS reval data

 

Score

 

 

Score

 

 

Feedback

We really do welcome any feedback you have for us - whether it be negative or positive, or whether it be a suggestion of something we could try/incorporate in a future Sprint Review. We absolutely don’t want to stand still. We’re very happy applying the 12th Agile principle of ‘becoming more productive’ to our Sprint Reviews themselves! Your contributions to this survey are entirely anonymous, should you wish to include anything others might perceive as controversial. We welcome any and all feedback, as long as it is constructive!